this is what happens when one doesn't build or complete any project under the due date... Read the History when it was started with time the material and labor cost goes high etc etc
Same happened with Nandipur Power Plant
6 months to end load shedding was just a political slogan... The Load shedding or Power Deficiency was not created in 1 day or 6 months so how can one end it in 6 months... from 2001 -2013 not a Single MW was added in National Grid... and you want PML N to add 10000 MW in 6 months
But yeah the work is underway on many projects it'll be reduced to Quiet extent