What's new

Hassanabdal-Mansehra Expressway (E35)...Updates

27857782_1849196655093327_1494986492816423464_n.jpg



27971684_1849196711759988_5724151594954449499_n.jpg




27750206_1758260440907834_1296646354987114201_n.jpg




Sowing of different species on both sides of Hazara motorway by BTAP.


27858137_2040904779528238_1177294036516728897_n.jpg
 
.
This was actually a large monsoon plantation drive with over 1200 persons taking part in it and different species were sown on both sides of entire motorway.

BTAP official FB page.

Volunteer Sowing of Local tree species on the both shoulder belts of Hazara Express Motorway (about 88 km) on 16:02:2018 under the very kind patronage of Syed Nazar Hussain Shah Worthy Secretary FE&WD.

Secretary F,E&WD, CCF KP, CF Watershed,CF Lower & Upper Hazara, All DFOs of NFR and 1200 contingent staff of 12 Forest Divisions of NFR, District Administration Haripur and Media Groups were participated the occasion.

About one tone seed of Kikar (230 kg), Phulai (200 kg), Ber (125 kg), Shisham (50 kg), Bakain (300 kg), Ailanthus (50 kg), Sanatha (100 kg), Ipple Ipple (50 kg) have been sown successfully which was collected free of cost by contingent staff.

27868130_2040904722861577_7040745304694107472_n.jpg




27857959_2040968732855176_5157200133940082524_n.jpg



27857970_2040968776188505_1373170342427208720_n.jpg
 
. . . . . . .
Updates 5/3/2018.

Work on a long and high bridge underway at Km 81 near UC Pawa, Abbottabad. In last pic, Girder launching is underway in Abbottabad.

28577472_1787232934905938_3818847060438951456_n.jpg





28795662_1787232954905936_7537461478002815111_n.jpg





28575581_1787232988239266_2435154935908482756_n.jpg






28577723_1787233011572597_8400458495366401454_n.jpg





28471364_1787233034905928_6153236989498534251_n.jpg





28577792_546594442392534_4255412001495966607_n.jpg
 
.
Here is a little glimpse of what is coming!! Beauty..

Shah Maqsood to Havelian Interchange.

28782889_2266592020021429_5054201916132841782_n.jpg





28577796_2266592096688088_8103304002217369021_n.jpg





28660431_2266592173354747_4043572760307443889_n.jpg





28577528_2266592243354740_8607667859319251215_n.jpg





28795235_2266592350021396_8224500259715849097_n.jpg
 
. . .
Hazara Motorway: Last remaining section to be opened in May

ISLAMABAD: The remaining 12km under-construction section of Hazara Motorway is almost complete and it will likely be opened for traffic in May.

Talking to APP, National Highway Authority (NHA) Member Motorway North Shahid Ehsan said by completing this portion, the Hazara Motorway would become fully operational and provide a modern six-lane road facility to the people of Havelian, Abbottabad and Mansehra.

A 47km section of the Hassanabdal-Havelian Motorway, commonly known as the Hazara Motorway, was opened for traffic from Burhan to Shah Maqsood interchange in December last year.

For timely construction of the motorway, it was divided into three packages out of which two packages were completed last year, but the third was delayed due to difficult terrain.

Ehsan said total length of the Hazara Motorway from Hassanabdal to Havelian would be 59.1 kilometres. The project would have five interchanges with toll plazas at entrance and exit points.He said a section up to Mansehra of Havelian-Thakot Motorway would be opened for traffic by May next year.
 
.
Updates 15/3/2018.

At km 80 & km 90 after Abbottabad towards Mansehra.

29027638_1789118348050730_886915360719903011_n.jpg




28872114_1789118414717390_8149247541754237855_n.jpg




28872795_1789118444717387_8735073007198302250_n.jpg
 
. .

Latest posts

Pakistan Defence Latest Posts

Back
Top Bottom