What's new

Govt to set up 40,000MW power projects: Asif

I think he used the wrong word, Obsession is more fitting than inferiority.

i know the word i was using, i have lived with Indians for many years -- ' Inferiority Complex is the word which best describes them.

inferiority complex
n
1. (Psychiatry) psychiatry a disorder arising from the conflict between the desire to be noticed and the fear of being humiliated,characterized by aggressiveness or withdrawal into oneself
 
.
i know the word i was using, i have lived with Indians for many years -- ' Inferiority Complex is the word which best describes them.

inferiority complex
n
1. (Psychiatry) psychiatry a disorder arising from the conflict between the desire to be noticed and the fear of being humiliated,characterized by aggressiveness or withdrawal into oneself

Lol your minister itself visited delhi 3 years back and made the comment that lahore should be developed like delhi.

Lahore Should Be Developed Like Delhi: Pak Minister | Dec 28,2012

I met a pakistani non resident well settled in canada and he pretend to be from delhi and later revealed that they migrated to pakistan after partition.I surprised why can't he tell that i am a pakistani at the beginning.I can give plenty of examples but don't want to discuss further as out of topic.bye

Humble advice- At least don't cheat your mind.
 
.
It is easier said than done.

40k of mixed electricity with significant chunk going to Hydro and Nuclear means we would need 80-120 billion dollars worth of investment to fulfil this dream.

Pakistan's energy demands are forcefully contained and if allowed to grow at natural pace it would easily consume electricity over 100.000 mw. So yes we need massive investment in energy sector but our economy is too weak to kick start most of the projects on its own.
 
.
They should firstly sell the FINANCIAL & POWER SECTOR and pay back money toIMF.
 
. .
Lol your minister itself visited delhi 3 years back and made the comment that lahore should be developed like delhi.

Lahore Should Be Developed Like Delhi: Pak Minister | Dec 28,2012

I met a pakistani non resident well settled in canada and he pretend to be from delhi and later revealed that they migrated to pakistan after partition.I surprised why can't he tell that i am a pakistani at the beginning.I can give plenty of examples but don't want to discuss further as out of topic.bye

Humble advice- At least don't cheat your mind.

Well i was renting an apartment in Scotland and police raided a two bedroom flat in the same building. There were 15 people staying there. They told police that they were Pakistanis but when asked for documents everyone turned out to be indian. I dont know the reasons but if i had to guess they wanted to humiliate pakistanis by labeling themselves as such. Now that is what we call obsession.
 
.
10,250 MW would be set up in Sindh,

Guddu Power Plant 747 MW
Uch II Power Project (IPP) 404 MW
Jamshoro Thermal Power Station (Coal) 1320 MW
Sapphire Wind Power, Jhimpir 50 MW
Gharo Wind Power Project 250 MW
Thar Coal Power Project 660 MW
Port Qasim Coal fired Power Plants 1320 MW
Karachi Nuclear Power Plant (2) 2117 MW
Gaddani Power Project


2,720 MW in Balochistan,

Hubco


5,000 MW in Punjab,

Nandipur Thermal Power 525 MW
Chichoki Mallian Power Plant 525 MW
Coal fired Power Plant, Lahore 150 MW
Solid Waste to Energy Project 100 MW
Waste to Energy Project 20 MW
Coal-fired Power Plant, Faisalabad 150 MW
UAE Gifted 320MW Power Plant, Nishatabad
Sahiwal Coal-fired Power Plants, Qadirabad 1320 MW
Coal fired Power Plant, Multan 150 MW
Quaid-e-Azam Solar Park Lal Sohanra and Din Garh, Bahawalpur 1000 MW
Chashma Nuclear Power Complex 680 MW



11,917 MW in Gilgit Baltistan + 9,410 MW in Khyber Pakhtunkhwa, +4,000 MW in Azad Jammu and Kashmir.

Satpara Dam 17 MW
Harpo Hydropower Project 35 MW
Naltar V Hydro power 14 MW
Diamer Bhasha Dam 4500 MW
Shogo-Sen & Shushgai-Zhendoli hydropower projects, Chitral 144 MW
Dasu Hydropower Project 4320 MW
Keyal Khwar HydroPower 122 MW
Sharmai hydropower, Upper Dir 150 MW
Neelum-Jehlum Hydro Power Project 969 MW
Kohala Hydropower 1100 MW
Suki Kinari Hydropower 840 MW
Jabban Hydro Power Project 22 MW
Upgradation of Mangla Power Station by 320MW
Gomal Zam Dam 17 MW
Lower Palas Valley Hydropower 665 MW
Duber Khawar Hydropower 130 MW
Lower Spat Gah Hydropower 665 MW
Tarbela 4th Extension 1410 MW
Gulpur Hydro power 100 MW

Ok we finally got details of 40,000MW

1431281248_201505102357.jpg
 
. .
dasu is in KPK group

the key projects are hydro projects
so far despite funding dasu hasnt been touch
mean while bhasha has no funding for this year
and bunji, even the pc1 is not ready.

all projects listed were either started by previous govt or financially closed by them, expect a few including dasu. Some pure thermal private projects that have become possible due to Chinese banks opening up for pakistan.

so far it seems it will be built the same way how bhasha dam was built; inaugurated by every govt for point scoring. LETS HOPE THAT I AM WRONG

infact some dams were completed couple of years back!
CEOgN0fUsAEz64w.jpg:large


i hope the current govt doesnt start mentioning whole tarbela dam(built in 60s) and warsak dam(built in 1930s) or katzara dam( not even on paper yet)
 
Last edited:
.
I am Punjabi but I have no problem with other provinces getting more .

then keep your problems to yourself and by the way check the projects again there are many many stuff that other provinces are going to get from CPEC
 
.
We have been hearing each successive government announcing gazillion MW projects. Most never start and few are ever completed. Just report/post what has started production all else is just junk news !!!
 
.
we need real power plant not ORAL power plant of just talking
 
.

Latest posts

Country Latest Posts

Back
Top Bottom