What's new

Govt to order 100 Tejas aircrafts for IAF

Rangila

SENIOR MEMBER
Joined
Feb 20, 2013
Messages
2,211
Reaction score
-2
Country
Venezuela, Bolivarian Republic Of
Location
Argentina
Govt to order 100 Tejas aircrafts for IAF- Business News

01fir04-1_660_120115081506.jpg



Decks have been cleared for the country's largest ever defence order, over RS 2 trillion for 100 Light Combat Aircraft (LCA)Tejas.

At a crucial November 27 governing body meeting of the DRDO's Aeronautical Development Agency (ADA) that included manufacturers Hindustan Aeronautics Ltd (HAL), the IAF brought down a wishlist of 57 outstanding maintenance issues with the aircraft down to 43, all of which can be executed by ADA and HAL without changing the aircraft design.

"We are now hopeful of an order for 100 Mark 1-As before the end of the current financial year," DRDO chief Dr S Christopher told MAILTODAY. The meeting of the governing council headed by Dr Christopher follows the September 23 signing of new aircraft specifications between the four key stakeholders in the three-decade old LCA project-the IAF, DRDO, MoD and HAL. The agreement has launched the struggling LCA Tejas project on a new trajectory. Designs of the Mark-1A will be complete by 2017 and the modified aircraft could enter production beginning 2019.

HAL is currently supplying the IAF with 20 variants of the basic LCA Tejas. The DRDO chief says the Mark 1-A Tejas will address other shortcomings indicated by the IAF like the lack of an Active Electronically Scanned Array or AESA radar and Electronic Support Measures (ESM) which will be carried on a pod instead of within the fuselage. The modified Mark 1-A was proposed by HAL this year as a stop gap because the Mark 2 with uprated GE-414 engines and a lengthened fuselage, will not be ready for induction before 2024.

"Re-positioning of major (aircraft) aggregates for the ease of maintenance has nullified the requirement to stretch the fuselage that would have increased aerodynamic drag to such levels as to require the more powerful F-414 engine. This negates the requirement to have LCA Mk2 for the IAF," says Air Vice Marshal Manmohan Bahadur (retired) of the Centre for Air Power Studies. Significantly, HAL has assured the IAF that it will double production capacity in its Bengaluru facility to roll out 16 aircraft each year.

The Mark 1-A is meant to arrest the alarming shortfall in the IAF's fighter squadron fleet from a sanctioned strength of 39.5 squadrons to the present 35 squadrons. These squadrons are projected to further dip by 2022 when over 200 MiG-21 and MiG-27s are phased out. The ADA is now designing the LCA's Mark 2 variant only for the Indian Navy and the design will be ready by 2022. The agency also hopes to complete designs of a generation 4.5 Advanced Medium Combat Aircraft by 2022.

(In Association with Mail Today)
 
The price quoted by the News agency is totally wrong.The price of every single LCA MK-I was around Rs.1.62 billions last year,so it's safe to guess that the price of the newer MK-IAs will be around Rs. 2.5-3 billions at max.Hence the cost of 100 MK-IA will be around Rs.250-300 billions,add to that another Rs, 250-300 billions for training,infrastructure and spare parts.Still the total cost comes around Rs. 500-600 billions i.e. around $8-9.2 billions,but here the figure for the entire deal that is highly exaggerated(intentionally or otherwise) at Rs.2 trillions or around $31.5 billions which basically out of this world.Heck even the entire MMRCA deal would cost us around $20-25 billions including all the weapons packages:coffee:!!
@Abingdonboy buddy can you please look at this figure and confirm my doubt once and for all,thanks in advance:).
 
Last edited:
The price quoted by the News agency is totally wronf.The price of every single LCA MK-I was around Rs.1.62 billions last year,so it's safe to guess that the price of the newer MK-IAs will be around Rs. 2.5-3 billions at max.Hence the cost of 100 MK-IA will be around Rs.250-300 billions,add to that another Rs, 250-300 billions for training,infrastructure and spare parts.Still the total cost comes around Rs. 500-600 billions i.e. around $8-9.2 billions,but here the figure for the entire deal that is highly exaggerated(intentionally or otherwise) at Rs.2 trillions or around $31.5 billions which basically out of this world.Heck even the entire MMRCA deal would cost us around $20-25 billions including all the weapons packages:coffee:!!
@Abingdonboy buddy can you please look at this figure and confirm my doubt once and for all,thanks in advance:).
looks more like yet another paid media prestitute brain frat cost of LCA MK1a is around 30million $$s so its around 3 billion for 100 LCA MK1a's add to that 1-1.5 billion for wepons package & 2 billion for training & maintainence infra (3+1.5+2=6.5) setup

still is less than MRCA :coffee:
 
The very fact that Indian scientists were able to address maintenance challenges and retain the current size of fuselage is encouraging...
 
Frankly

I am more curious than any Indian fan to see fate of Tejas .......

It's being generations dude........

Can't wait any more.......
 
The price quoted by the News agency is totally wronf.The price of every single LCA MK-I was around Rs.1.62 billions last year,so it's safe to guess that the price of the newer MK-IAs will be around Rs. 2.5-3 billions at max.Hence the cost of 100 MK-IA will be around Rs.250-300 billions,add to that another Rs, 250-300 billions for training,infrastructure and spare parts.Still the total cost comes around Rs. 500-600 billions i.e. around $8-9.2 billions,but here the figure for the entire deal that is highly exaggerated(intentionally or otherwise) at Rs.2 trillions or around $31.5 billions which basically out of this world.Heck even the entire MMRCA deal would cost us around $20-25 billions including all the weapons packages:coffee:!!
@Abingdonboy buddy can you please look at this figure and confirm my doubt once and for all,thanks in advance:).
The Mk1A atleast would cost $40 -$50 million, so the order not going to be more than $ 7 bn dollars,

including building new MRO centers, upgrading airbases & training technicians for LCA.
 
Frankly

I am more curious than any Indian fan to see fate of Tejas .......

It's being generations dude........

Can't wait any more.......
owr biggest obstackle is owr corrupt beurocracy , media & politicians which for almost a decade let no opportunity to go in wane to sabotage all indian wepon programmes and almost got away .... it was the ABVs NDA that seeded arjun , LCA , MKI , Vikrmaditya programmes among many others while UPA dellibaretelli messed up and delayed almost all of them onli now with new goverment there is a push for indian wepons lets hope it gets to its desired destiny :coffee:

The Mk1A atleast would cost $40 -$50 million, so the order not going to be more than $ 7 bn dollars,

including building new MRO centers, upgrading airbases & training technicians for LCA.
no its aroung 30-35 million check your facts sir the MK1 was around 25 so adding AESA radar and AESA based EW suite and ECM + IFR & OBOGS is maximum 10 million $$s
 
Govt to order 100 Tejas aircrafts for IAF- Business News

01fir04-1_660_120115081506.jpg



Decks have been cleared for the country's largest ever defence order, over RS 2 trillion for 100 Light Combat Aircraft (LCA)Tejas.

At a crucial November 27 governing body meeting of the DRDO's Aeronautical Development Agency (ADA) that included manufacturers Hindustan Aeronautics Ltd (HAL), the IAF brought down a wishlist of 57 outstanding maintenance issues with the aircraft down to 43, all of which can be executed by ADA and HAL without changing the aircraft design.

"We are now hopeful of an order for 100 Mark 1-As before the end of the current financial year," DRDO chief Dr S Christopher told MAILTODAY. The meeting of the governing council headed by Dr Christopher follows the September 23 signing of new aircraft specifications between the four key stakeholders in the three-decade old LCA project-the IAF, DRDO, MoD and HAL. The agreement has launched the struggling LCA Tejas project on a new trajectory. Designs of the Mark-1A will be complete by 2017 and the modified aircraft could enter production beginning 2019.

HAL is currently supplying the IAF with 20 variants of the basic LCA Tejas. The DRDO chief says the Mark 1-A Tejas will address other shortcomings indicated by the IAF like the lack of an Active Electronically Scanned Array or AESA radar and Electronic Support Measures (ESM) which will be carried on a pod instead of within the fuselage. The modified Mark 1-A was proposed by HAL this year as a stop gap because the Mark 2 with uprated GE-414 engines and a lengthened fuselage, will not be ready for induction before 2024.

"Re-positioning of major (aircraft) aggregates for the ease of maintenance has nullified the requirement to stretch the fuselage that would have increased aerodynamic drag to such levels as to require the more powerful F-414 engine. This negates the requirement to have LCA Mk2 for the IAF," says Air Vice Marshal Manmohan Bahadur (retired) of the Centre for Air Power Studies. Significantly, HAL has assured the IAF that it will double production capacity in its Bengaluru facility to roll out 16 aircraft each year.

The Mark 1-A is meant to arrest the alarming shortfall in the IAF's fighter squadron fleet from a sanctioned strength of 39.5 squadrons to the present 35 squadrons. These squadrons are projected to further dip by 2022 when over 200 MiG-21 and MiG-27s are phased out. The ADA is now designing the LCA's Mark 2 variant only for the Indian Navy and the design will be ready by 2022. The agency also hopes to complete designs of a generation 4.5 Advanced Medium Combat Aircraft by 2022.

(In Association with Mail Today)

@GURU DUTT Pls post E to Sasur Hona Hi Tha Pic

The Mk1A atleast would cost $40 -$50 million, so the order not going to be more than $ 7 bn dollars,

including building new MRO centers, upgrading airbases & training technicians for LCA.
With high number of LCA order 100 MK-1A, 90 trainer, the cost would steep down, should be around 30-35 Million
 
@GURU DUTT Pls post E to Sasur Hona Hi Tha Pic


With high number of LCA order 100 MK-1A, 90 trainer, the cost would steep down, should be around 30-35 Million
ye to hona hi tha.jpg


ab khush :azn:

the deal on 100 fighters and some 40 trainers + wepons+training and mantainence infra setup package in all wont cross more than 10 biilon $$s period :coffee:
 
no its aroung 30-35 million check your facts sir the MK1 was around 25 so adding AESA radar and AESA based EW suite and ECM + IFR & OBOGS is maximum 10 million $$s
Actually, this is wrong figure.

The flyaway cost is $22 million, not $30-35 million. And I was not just talking about the flyaway cost.

Obviously. Not trainer, but supersonic LIFT variant.
 
i dnt understand why IAF want AESA radar on 3rd (Heavy, Medium and light) line of aircraft. Even today any IAF plane does not have AESA.
 

Pakistan Defence Latest Posts

Back
Top Bottom