WishLivePak
SENIOR MEMBER
- Joined
- May 24, 2014
- Messages
- 4,424
- Reaction score
- -4
- Country
- Location
Since I see PTI members loling in Punjab improvement thread and PML PTI trolling Qalandari in PPP thread, why not have one thread where we can compare the results of leading parties?
Transportation:
PML:
1) Ending Car cartels and imposing safety features (air bags etc). (Completed)
2) Metro Bus Islamabad/Rawalpindi (Completed)
3) PIA inducted 13 airplanes. 7 more to come this year (Completed)
4)Railway has improved significantly. Losses are falling, on time arrivals and people are generally happy. (Ongoing)
5) Metro Bus Multan (Ongoing)
6) Multan airport completed. Renovation to go for Peshawar and Lahore (Ongoing)
8) Pak China economic corridor (Ongoing)
Health
PTI:
1) Sehat ka Insaaf (Ongoing)
2) PTI says hospitals improved (Ongoing)
3) SKMH Peshawar (Ongoing)
PML:
1) World largest kidney hospital (someone confirm?) (Ongoing)
2) some other hospitals please name. Must be significant. I can't remember.
Governance:
PTI:
1) Patwari system ended (Ongoing)
2) Police independent (Ongoing)
3) Ilegal property on Govt land being bulldozed (but govt giving free replacement shops/compensation) (Ongoing)
4) Mobile court (is it still active?) (Completed)
5) Dharna (Ended)
6) Imran threatening gov't (Ongoing)
PML:
1) NAB going after some crooks (Ongoing)
2) Karachi operation (those who think army forced him, well, Nawaz has history of launching operation in Katachi, read 90s) (Ongoing)
3) Zarb-e-Azab (Ongoing)
4) PCB independent and cricket doing good
5) Corruption (Ongoing)
Baluchistan:
1) CM trying to bring Baloch separatist to table (Ongoing)
Energy:
PTI:
1) Mini Dams (are they still making them?) (Ongoing)
2) Solar street lights in many districts (Ongoing)
PML:
1) LNG terminal completion (Completed)
2) Azam Solar parks partially working (Ongoing)
PPP:
1) Hiring Internet PR, I.e. Qalandari (Completed)
2) handling over govt work to Malik Riaz (Ongoing)
Education:
PTI:
1) Education ka insaaf? (Ongoing)
PML:
1) Danish school (Ongoing)
2) Free laptops (Ongoing)
3) Public WIFI at parks and other places (Ongoing)
-----
1) Post stuff that's completed after May 2013
2) Post with evidence. No "I think, or I recall"
3) Projects must have deadline of one year from day of posting. Faisalabad metro bus will be made before 2018, but it won't be completed one year from now, hence not included (Example).
@cb4 I'll need a lot of your help.
@Leader you too, but please no propaganda.
Thread is work in progress hence it looks ugly. If you got a problem, go make your own. Trolls are welcome and should not be reported. People who are concerned need to look at OP post to stay updated and ignore going through pages to see progress, as is the case for other development threads.
Transportation:
PML:
1) Ending Car cartels and imposing safety features (air bags etc). (Completed)
2) Metro Bus Islamabad/Rawalpindi (Completed)
3) PIA inducted 13 airplanes. 7 more to come this year (Completed)
4)Railway has improved significantly. Losses are falling, on time arrivals and people are generally happy. (Ongoing)
5) Metro Bus Multan (Ongoing)
6) Multan airport completed. Renovation to go for Peshawar and Lahore (Ongoing)
8) Pak China economic corridor (Ongoing)
Health
PTI:
1) Sehat ka Insaaf (Ongoing)
2) PTI says hospitals improved (Ongoing)
3) SKMH Peshawar (Ongoing)
PML:
1) World largest kidney hospital (someone confirm?) (Ongoing)
2) some other hospitals please name. Must be significant. I can't remember.
Governance:
PTI:
1) Patwari system ended (Ongoing)
2) Police independent (Ongoing)
3) Ilegal property on Govt land being bulldozed (but govt giving free replacement shops/compensation) (Ongoing)
4) Mobile court (is it still active?) (Completed)
5) Dharna (Ended)
6) Imran threatening gov't (Ongoing)
PML:
1) NAB going after some crooks (Ongoing)
2) Karachi operation (those who think army forced him, well, Nawaz has history of launching operation in Katachi, read 90s) (Ongoing)
3) Zarb-e-Azab (Ongoing)
4) PCB independent and cricket doing good
5) Corruption (Ongoing)
Baluchistan:
1) CM trying to bring Baloch separatist to table (Ongoing)
Energy:
PTI:
1) Mini Dams (are they still making them?) (Ongoing)
2) Solar street lights in many districts (Ongoing)
PML:
1) LNG terminal completion (Completed)
2) Azam Solar parks partially working (Ongoing)
PPP:
1) Hiring Internet PR, I.e. Qalandari (Completed)
2) handling over govt work to Malik Riaz (Ongoing)
Education:
PTI:
1) Education ka insaaf? (Ongoing)
PML:
1) Danish school (Ongoing)
2) Free laptops (Ongoing)
3) Public WIFI at parks and other places (Ongoing)
-----
1) Post stuff that's completed after May 2013
2) Post with evidence. No "I think, or I recall"
3) Projects must have deadline of one year from day of posting. Faisalabad metro bus will be made before 2018, but it won't be completed one year from now, hence not included (Example).
@cb4 I'll need a lot of your help.
@Leader you too, but please no propaganda.
Thread is work in progress hence it looks ugly. If you got a problem, go make your own. Trolls are welcome and should not be reported. People who are concerned need to look at OP post to stay updated and ignore going through pages to see progress, as is the case for other development threads.
Last edited: