What's new

Dhaka likely to join TAPI project to tap C Asian gas: TAPI accepts proposal

CaPtAiN_pLaNeT

SENIOR MEMBER
Joined
May 10, 2010
Messages
7,685
Reaction score
0
Dhaka likely to join TAPI project to tap C Asian gas
TAPI accepts proposal


New Age | Newspaper

Manjurul Ahsan

Four-nation TAPI steering committee has accepted an initial proposal of Bangladesh for its inclusion in the trans-border gas pipeline project under which the country would import gas from Turkmenistan through Afghanistan, Pakistan and India, officials said.

It said that Asian Development Bank, on behalf of the steering committee, had sent a letter to the economic relations division of Bangladesh on July 2 with a request to submit a formal proposal to Turkmenistan by July 15.

The steering committee is composed of the deputy chairman of cabinet ministers of Turkmenistan, minister of mines of Afghanistan, minister of petroleum and natural resources of Pakistan and minister of petroleum and natural resources of India.

The ADB is the coordinator and facilitator of the project connecting one of Central Asia’s largest energy suppliers with South Asia’s critically underserved market.

Bangladesh will need to specify technical details like expected gas off-take volume, gas quality, delivery pressure and expected off-take date.

Energy Division officials, however, told New Age that they had not received the letter from ERD. Besides, a technical assessment for the proposed inclusion of Bangladesh into the TAPI project has not yet been made.

An Energy Division official said that Gas Transmission Company Limited had been asked to make a preliminary technical assessment of the proposed inclusion of Bangladesh into the project more than a month ago.

‘But GTCL is yet to submit the report to the ministry,’ he said.

A GTCL official said they would send the report to the ministry soon.

Asked about the government’s plan in this regard, another Energy Division official said that technical and financial feasibility of the project should be assessed first.

‘We may request the ADB to conduct a feasibility study on the viability of extending the TAPI pipeline from India’s Punjab province to Bangladesh,’ he said.

Bangladesh would go for implementation of the project if the gas imported from Turkmenistan is cheaper than that imported in the form of liquefied natural gas, the official said.

He said that a pipeline and a number of gas compressor stations which would be installed to connect Bangladesh with TAPI would involve a huge investment. In addition, he said Bangladesh would have to participate in installing a 1,680 kilometres pipeline from the gas field in Turkmenistan to India through Afghanistan and Pakistan.

According to an assessment made in 2008, $7.6 billion would be needed for building infrastructure for gas transportation from Turkmenistan to India through Afghanistan and Pakistan.
After a decade-long negotiation, the four nations on May 23 this year signed a gas purchase and sales agreement under which Turkmenistan would supply around 3,200 million cubic feet of gas a day — around 1,350 mmcfd each to Pakistan and India while the rest to Afghanistan — for a 30-year period.

Turkmenistan is expected to supply gas from 2018.

Amid severe energy crisis, Bangladesh initiated negotiations to import gas from energy-rich Central Asia through pipeline in 2010.

At the same time, the government initialled a process to import liquefied natural gas from the Middle East.

It has been assessed that at present, LNG would cost Bangladesh $16 a thousand cubic feet (unit) of gas while the country is buying gas at around $3 a unit from international oil companies which are operating the local gas fields.

Petrobangla, the state-run Oil, Gas and Mineral Resources Corporation, supplies around 2,200 mmcfd gas to the national grid with a shortfall of more than 500 mmcfd against the daily demand.
 
.
Good.. It will help the engineers to get paid more but BD will get gas last...

Btw, I'm asking India quit the IP pipeline - because it didn't want oil to be shipped through it's enemy Pakistan (understandable), but why did India go along with TAPI that runs through Pakistan also?
 
.
Good.. It will help the engineers to get paid more but BD will get gas last...

Btw, I'm asking India quit the IP pipeline - because it didn't want oil to be shipped through it's enemy Pakistan (understandable), but why did India go along with TAPI that runs through Pakistan also?

the same reason pakistanis come to india for medical treatment: dire need and trust
 
. .
Ah, so you admit that India needs Pakistan... Good... :)

we are neighbours what different can you expect??????????

its in the interest of boath the nations to have friendly relations. & India has always strived for that, but its efforts have failed till date to build trust because of some 'Non State Actors'
 
.
Gas to bangladesh through india ... Its conspiracy of rawami to blackmail them in future
 
.
Dhaka likely to join TAPI project to tap C Asian gas
TAPI accepts proposal


New Age | Newspaper

Manjurul Ahsan

Four-nation TAPI steering committee has accepted an initial proposal of Bangladesh for its inclusion in the trans-border gas pipeline project under which the country would import gas from Turkmenistan through Afghanistan, Pakistan and India, officials said.

It said that Asian Development Bank, on behalf of the steering committee, had sent a letter to the economic relations division of Bangladesh on July 2 with a request to submit a formal proposal to Turkmenistan by July 15.

The steering committee is composed of the deputy chairman of cabinet ministers of Turkmenistan, minister of mines of Afghanistan, minister of petroleum and natural resources of Pakistan and minister of petroleum and natural resources of India.

The ADB is the coordinator and facilitator of the project connecting one of Central Asia’s largest energy suppliers with South Asia’s critically underserved market.

Bangladesh will need to specify technical details like expected gas off-take volume, gas quality, delivery pressure and expected off-take date.

Energy Division officials, however, told New Age that they had not received the letter from ERD. Besides, a technical assessment for the proposed inclusion of Bangladesh into the TAPI project has not yet been made.

An Energy Division official said that Gas Transmission Company Limited had been asked to make a preliminary technical assessment of the proposed inclusion of Bangladesh into the project more than a month ago.

‘But GTCL is yet to submit the report to the ministry,’ he said.

A GTCL official said they would send the report to the ministry soon.

Asked about the government’s plan in this regard, another Energy Division official said that technical and financial feasibility of the project should be assessed first.

‘We may request the ADB to conduct a feasibility study on the viability of extending the TAPI pipeline from India’s Punjab province to Bangladesh,’ he said.

Bangladesh would go for implementation of the project if the gas imported from Turkmenistan is cheaper than that imported in the form of liquefied natural gas, the official said.

He said that a pipeline and a number of gas compressor stations which would be installed to connect Bangladesh with TAPI would involve a huge investment. In addition, he said Bangladesh would have to participate in installing a 1,680 kilometres pipeline from the gas field in Turkmenistan to India through Afghanistan and Pakistan.

According to an assessment made in 2008, $7.6 billion would be needed for building infrastructure for gas transportation from Turkmenistan to India through Afghanistan and Pakistan.
After a decade-long negotiation, the four nations on May 23 this year signed a gas purchase and sales agreement under which Turkmenistan would supply around 3,200 million cubic feet of gas a day — around 1,350 mmcfd each to Pakistan and India while the rest to Afghanistan — for a 30-year period.

Turkmenistan is expected to supply gas from 2018.

Amid severe energy crisis, Bangladesh initiated negotiations to import gas from energy-rich Central Asia through pipeline in 2010.

At the same time, the government initialled a process to import liquefied natural gas from the Middle East.

It has been assessed that at present, LNG would cost Bangladesh $16 a thousand cubic feet (unit) of gas while the country is buying gas at around $3 a unit from international oil companies which are operating the local gas fields.

Petrobangla, the state-run Oil, Gas and Mineral Resources Corporation, supplies around 2,200 mmcfd gas to the national grid with a shortfall of more than 500 mmcfd against the daily demand.
Welcome aboard brother. We should make integrated economy,infrastructure & energy security. United we stand divided we fall.

Dhaka likely to join TAPI project to tap C Asian gas
TAPI accepts proposal


New Age | Newspaper

Manjurul Ahsan

Four-nation TAPI steering committee has accepted an initial proposal of Bangladesh for its inclusion in the trans-border gas pipeline project under which the country would import gas from Turkmenistan through Afghanistan, Pakistan and India, officials said.

It said that Asian Development Bank, on behalf of the steering committee, had sent a letter to the economic relations division of Bangladesh on July 2 with a request to submit a formal proposal to Turkmenistan by July 15.

The steering committee is composed of the deputy chairman of cabinet ministers of Turkmenistan, minister of mines of Afghanistan, minister of petroleum and natural resources of Pakistan and minister of petroleum and natural resources of India.

The ADB is the coordinator and facilitator of the project connecting one of Central Asia’s largest energy suppliers with South Asia’s critically underserved market.

Bangladesh will need to specify technical details like expected gas off-take volume, gas quality, delivery pressure and expected off-take date.

Energy Division officials, however, told New Age that they had not received the letter from ERD. Besides, a technical assessment for the proposed inclusion of Bangladesh into the TAPI project has not yet been made.

An Energy Division official said that Gas Transmission Company Limited had been asked to make a preliminary technical assessment of the proposed inclusion of Bangladesh into the project more than a month ago.

‘But GTCL is yet to submit the report to the ministry,’ he said.

A GTCL official said they would send the report to the ministry soon.

Asked about the government’s plan in this regard, another Energy Division official said that technical and financial feasibility of the project should be assessed first.

‘We may request the ADB to conduct a feasibility study on the viability of extending the TAPI pipeline from India’s Punjab province to Bangladesh,’ he said.

Bangladesh would go for implementation of the project if the gas imported from Turkmenistan is cheaper than that imported in the form of liquefied natural gas, the official said.

He said that a pipeline and a number of gas compressor stations which would be installed to connect Bangladesh with TAPI would involve a huge investment. In addition, he said Bangladesh would have to participate in installing a 1,680 kilometres pipeline from the gas field in Turkmenistan to India through Afghanistan and Pakistan.

According to an assessment made in 2008, $7.6 billion would be needed for building infrastructure for gas transportation from Turkmenistan to India through Afghanistan and Pakistan.
After a decade-long negotiation, the four nations on May 23 this year signed a gas purchase and sales agreement under which Turkmenistan would supply around 3,200 million cubic feet of gas a day — around 1,350 mmcfd each to Pakistan and India while the rest to Afghanistan — for a 30-year period.

Turkmenistan is expected to supply gas from 2018.

Amid severe energy crisis, Bangladesh initiated negotiations to import gas from energy-rich Central Asia through pipeline in 2010.

At the same time, the government initialled a process to import liquefied natural gas from the Middle East.

It has been assessed that at present, LNG would cost Bangladesh $16 a thousand cubic feet (unit) of gas while the country is buying gas at around $3 a unit from international oil companies which are operating the local gas fields.

Petrobangla, the state-run Oil, Gas and Mineral Resources Corporation, supplies around 2,200 mmcfd gas to the national grid with a shortfall of more than 500 mmcfd against the daily demand.
Welcome aboard brother. We should make integrated economy,infrastructure & energy security. United we stand divided we fall.
 
.
If Bangladesh enters then it will be good for India as we won't be on the end of this line. Any blockage of pipeline from entering India would also effect BD, but the problem might be the same, would they (pakistan) care too much about BD. Ponder your thoughts on it.
 
.
If Bangladesh enters then it will be good for India as we won't be on the end of this line. Any blockage of pipeline from entering India would also effect BD, but the problem might be the same, would they (pakistan) care too much about BD. Ponder your thoughts on it.

Another point to be considered is that it will evenly help to distribute the gas in northern India by making various exit point for gas along the pipeline and at the same point earning transit $$ from Bangladesh.

.....ONLY if the project succeed
 
.
When more than 4 countries depend on one pipeline it not abut trusting Pakistan per say,but trusting there instinct to make money.

IF they fail to protect the line,it wont be India wailing on them with accusations,it would be 4 other nations also.

SO if Pak wants itself to be acknowledged as a nation with high professional standards then i have no doubt it will protect its interests.
 
.
We are buying gas from our field from BAPEX for 20 Taka per square foot and from foreign company at the rate of 280 taka(around 3 dollar ) on the other hand TAPI would cost us 14 dollar per square foot . how can we bear that amount ? though we in dare need of gas right at this moment yet govt. need to cautious step to fulfill the demand .
 
.
We are buying gas from our field from BAPEX for 20 Taka per square foot and from foreign company at the rate of 280 taka(around 3 dollar ) on the other hand TAPI would cost us 14 dollar per square foot . how can we bear that amount ? though we in dare need of gas right at this moment yet govt. need to cautious step to fulfill the demand .

You ask that to captain of Awami fanboy club CaPtAiN_pLaNeT. He is the one who find such propaganda centric news worthy of any value.

1) Did any pipeline being built through Afghanistan, Pakistan and India, answer is no.
2) How much the pipeline upto would cost and who will bear the cost?
3) Was there any determiniation that there will be surplus gas after Pakistani and Indian consumption?
4) Where would Awami regime will get money to pay 14 dollar per square foot? Ahha answer is sucking blood out of Bangladeshi people and economy as subsidy.

Awami League with indian instruction directing and wasting Bangladesh attention from most immediate eneregy source, that is Myanmar. By diverting our limited energy sourcing resource and giving up effort on cheaper option Awami regime clearing the way for energy market for Mayanmar gas in india. Also, by going after this far fetch scheme Awami league is lying foundation to come back to power by riding on big oil lobby trail.
 
.
We are buying gas from our field from BAPEX for 20 Taka per square foot and from foreign company at the rate of 280 taka(around 3 dollar ) on the other hand TAPI would cost us 14 dollar per square foot . how can we bear that amount ? though we in dare need of gas right at this moment yet govt. need to cautious step to fulfill the demand .

$14 Dollars, duh thats the international price of gas. Whats ur proposition? dont gererate costly electricity and go back to using candles.

You ask that to captain of Awami fanboy club CaPtAiN_pLaNeT. He is the one who find such propaganda centric news worthy of any value.

1) Did any pipeline being built through Afghanistan, Pakistan and India, answer is no.
2) How much the pipeline upto would cost and who will bear the cost?
3) Was there any determiniation that there will be surplus gas after Pakistani and Indian consumption?
4) Where would Awami regime will get money to pay 14 dollar per square foot? Ahha answer is sucking blood out of Bangladeshi people and economy as subsidy.

Awami League with indian instruction directing and wasting Bangladesh attention from most immediate eneregy source, that is Myanmar. By diverting our limited energy sourcing resource Awami regime clearing the way for Myanmar energy market in india. Also, by going after this far fetch scheme Awami league is lying foundation to come back to power by riding on big oil lobby trail.

:yawn: dont have any solutions ur self other than to negate everything someone else does?
 
.
According to TAPI deal signed gas pipelined proposed was to carry 90 million metric standard cubic metres a day (mmscmd).

38 mmscmd for Pakistan
38 mmscmd for India
14 mmscmd for Afghanistan

Where is the gas for Bangladesh? Besides, by 2017 India's demand for gas will increase 3 fold from current level of 166.2 MFCD to 473 MMCD. Similar stories goes for Pakistan. Can indians and captain of Awami fanboy club, CaPtAiN_pLaNeT show us where is the gas for Bangladesh from TAPI?

TAPI pipeline gas sale agreement signed
The TAPI pipeline will have a capacity to carry 90 million metric standard cubic metres a day (mmscmd) of gas for a 30-year period and is likely to become operational by 2018. India and Pakistan would get 38 mmscmd each, while the remaining 14 mmscmd will be supplied to Afghanistan.
http://www.thehindu.com/business/Economy/article3449588.ece
 
.
Another awami delusion of grandeur and as usual captain BAL fell of it. Captain bhai what about padma bridge or do you believe
the kalo bilai logic of 16koti manucher 32 koti hath die ai bridge kora shombob.
 
.

Latest posts

Back
Top Bottom