FUTURE PROJECTS
DIAMER BASHA DAM PROJECT
LOCATION
Diamer Basha Dam Project (DBDP) is proposed to be located on the Indus River
315 km (195 miles) upstream of Tarbela Dam site, about 180 km (113 miles) below
the town of Gilgit and about 40 km (24 miles) downstream of Chilas, the district
headquarter of Diamer in Gilgit-Baltistan.
MAIN FEATURES OF DBDP
Main Dam
Maximum Height 272 m
Type Roller Compacted Concrete (RCC)
Diversion System 2 No. Diversion Tunnels (right side)
1 No. Diversion Channel (right side)
Upstream and Downstream Cofferdams
Main Spillway
No. of gates 14
Size of gate 11.5 x 16.24 m
Reservoir
Full Supply Level 1160 masl
Crest Elevation Level 1170 masl
Gross Storage 8.1 MAF (10.0 BCM)
Live Storage 6.4 MAF (7.9 BCM)
Min. operating level 1060 masl
Outlets In Dam Body
Low level 2
Flushing 5
P
ower House(s) 2
Total Installed Capacity 4500 MW
Location and Type Underground, one each on right and left side
No. of Units 12 each of 375 MW
Average Generation 19208 Gwh/year
(Diamer Basha = 18097 Gwh/year)
(Tarbela = 1111 Gwh/year)
PC-I Cost Rs.894.257 billion (with FEC Rs.312.943 billion)
EIRR 15.3%
FIRR 8.04%
Benefit/Cost Ratio 1.43
MAIN PROJECT IMPLEMENTATION
Implementation / construction activities of main project shall commence in
2012-2013 and completion is envisaged in 2020-2021
KURRAM TANGI DAM MULTIPURPOSE PROJECT
LOCATION OF DAM
The proposed project site is located at Kurram River about 9 miles upstream of Kurram Garhi Head Works and 19 miles North of Bannu City in North Waziristan Agency of Khyber Pakhtunkhwa.
- Hydropower generation of 83.4 MW.
- Flood Control.
- Irrigated agriculture development of 84,380 Acres.
- Dam Height 322 FT.
Construction Period 4 years
Completion 2018
MUNDA DAM PROJECT
LOCATION
This project is proposed to be constructed on Swat River about 5 Km upstream of Munda Head works in Mohmand Agency FATA Khyber Pakhtunkhwa.
- Hydropower generation of 740 MW
- Flood Control
- Irrigated Agriculture development of 15,100 Acres command Area.
Type of Dam Concrete Faced Rock Fill
Height of Dam 700 Ft.
Gross Storage 1.290 MAF
Live Storage 0.676 MAF
Dead Storage 0.314 MAF
Flood Storage 0.081 MFA
Power Capacity 740 MW
Command Area 15,100 Acres
Project Cost (year 2010) US $ 1,401 Million
Detailed Engineering Design Period 2 years (Starting June 2012)
Construction Period 7 Years
Completion 2021
AKHORI DAM
LOCATION
Akhori Dam site is loacted near Akhori Village across Nandna Kas, a small tributary of Haro River in Attock District of Punjab.
Features
Main Dam
Dam Type Earth & Rock Fill
Height 400 feet
Gross Storage 7.6 MAF
Live Storage 6.00 MAF
Saddle Dam
Height 213 feet
Length 4.78
Conveyance Channel
Conveyance Channel Length 23 Miles (37 Km)
Conveyance Channel Capacity 60,000 Cusecs
Bed Width 249.3ft (76 m)
Depth 32..8ft (10 m)
Installed Capacity
Hydel Power Potential 600 MW (2155 GWh/Annum)
Environmental and Resettlement
No of Affectees 55800
No of Houses 9270
Land 65976 Acres
Roads 102 Kms
Estimated cost US$ 4.40 Billion
Construction Period 5 Years
Completion Unknown
HYDROPOWER PROJECTS
GOLEN GOL HYDROPOWER PROJECT
Location
The project is located on Golen Gol Mullah, a tributary of Mastuj River, 25 Km from Chitral Town in KPK.
To Generate 106 MW Hydel Electricity
DATE OF COMMENCEMENT
February 2011
DATE OF COMPLETION
February 2015
SALIENT FEATURES
Installed Capacity MW 106 MW
Annual Energy GWH 436
Design Discharge 30 m3/sec
Tunnel Length 3.8 KM
Design Head 435 M
DASU HYDROPOWER PROJECT
Location
Dasu hydropower project is a run of river scheme located 7 km upstream of Dasu village on Indus River, 74 km downstream of Diamer Basha Dam and 350 km from Islamabad. The Project is located in district Kohistan of Khyber Pakhtunkhwa.
Objectives/Benefits
To Design a Project of 4320 MW to produce mean annual hydroelectricity of 21300 GWh.
Date of Commencement
April 2010
Date of Completion
March 2019
SALIENT FEATURES
Installed Capacity MW 4320
Mean Annual Energy GWH 21300
Design Discharge m3/Sec 2600
Type of Dam RCC
Gross Head (M) 233
Construction Period (Years) 8
No. & Type of Turbine 8
Project Base Cost US$ 5.28 Billion