Comet
SENIOR MEMBER
- Joined
- May 14, 2008
- Messages
- 2,508
- Reaction score
- 0
- Country
- Location
frankly speaking i believe Skardu-Katzara dam is going to be the second most controversial project after Kalabagh Dam in the first 100 years of Pakistan's history and i don't see it happening for the next 20 or 30 years at least.
You see WAPDA is currently busy in 32 smaller dams project + diamer bhasha dam. Once all these dams are completed they will focus other larger dams like Dasu, Bunji and Yulbu etc and all these projects requires at least 20 years to be completed.
This Skardu dam is going to be one of the tallest dam on earth and if incase one small disaster takes place. It has the potential to destroy not only 1-2 city but perhaps the whole of the provinces or even half of the country in my opinion. This dam although generating a lot of electricity to fullfill our future demands at a very cheap prices but is highly risky if ever decided to go ahead.
I would say WAPDA is doing a right job by constructing smaller dams first. Once they are done with that, our water storage system will gradually improve and then we must move forward for bigger dams. This Skardu dam should only be concentrated after all the current and future projects on pipeline are completed so this way we will have enough space to store water to prevent the damage if they go for Skardu dam afterwards
I hope you got what i mean
But, I believe that all these smaller dams combined cannot produce energy equivalent to Skardu Dam.
Also, Pakistan has signed MoU with China and I believe China is providing soft loan for Bunji Dam Construction. I have been to the site and there were boards there stating: Site for Bunji Dam.