What's new

Current load-shedding result of PTI’s inefficient power policies ‘We are fixing it,: PM shahbaz

PM Showbaz shame on you for using expensive aircraft to SA for Umarah..
Khan did not do this.. Please answer.

Foreign Ministery has requested PIA to provide a Boing 777 airplane for PM Shehbaz's visit to Saudi Arabia.

He is expected to travel with his family and delegation to perform Umrah.

It'll be for first time in four years that a Premier is using a Boing 777. Ex PM Khan travelled either by commercial flights or by Gulf Stream jet for his tours as he had started an austerity campaign to cut down expenses.
 
.
This thread has been one of the most hilarious reads in PDF @INDIAPOSITIVE @Areesh :enjoy:

PS: Both of you have the most hilarious DP on this forum. I always chuckle at it when I read your message here :laugh:
 
.
What's with sanghis like @INDIAPOSITIVE making Shehbaz Sharif their new abbu?

Modi has been dethroned from the abbu status by you guys?
The Indians will support anything Anti-Pakistan.

It’s a pretty easy test to understand which issues are against Pakistan’s long term national interests - the Indians will start vociferously supporting those issues.
 
.
On the contray solar energy IS VERY CHEAP
ask anyone who is putting pannels on their top house
ofocurse its going to be expenisve if your return rate is 30-40%(perozanl deal with kick backs) vs 7-10%(bidding)

With respect to stability..you have 10,000 mws battery capacity installed through out the country..or 40% of your requirement

Now if you are too lazy to understand what i mean by "battery"
Read about control watwr release from hydro plants
We have a maintenance nightmare. Our trained sarkari crew has a habit of destroying things .... look at Steel Mill , HMC , machine tool factory, and the list goes on and on and on ..
 
.
ISLAMABAD: Prime Minister Shehbaz Sharif on Monday said the current issue of load-shedding in the country was due to the policies of the government of Pakistan Tehreek-e-Insaf which failed to address the problem of electricity generation in its tenure.

“The PTI government neither purchased fuel in time nor repaired power plants. Hence the current load-shedding,” he said in a tweet. Shehbaz Sharif recalled that previously, Pakistan Muslim League leader Mian Nawaz Sharif during his government had ended the worst load-shedding in five years.


He mentioned that expensive power generation by the PTI government through inefficient plants was costing the people Rs.100 billion per month. PM Sharif said his government was making efforts to fix the problem of load-shedding.


‘We are fixing it,’ says PM Shehbaz while blaming PTI for energy crisis​


“PTI govt neither purchased fuel in time nor repaired power plants. Hence the current load-shedding,” PM Shehbaz Sharif said.

Costly power generation through inefficient plants is costing the people Rs100 billion per month, he pointed out, adding: “We are fixing it”.


A day earlier, the prime minister also directed the relevant authorities to end the load-shedding in the country immediately.

The prolonged loadshedding has been causing difficulties for public to perform their daily chores, especially during sehri and iftar times.

Amid hot weather, Pakistanis have been suffering 8 to 15 hours of scheduled and unscheduled power outages on a daily basis across the country.

Karachi, Lahore, Peshawar, Rawalpindi, Quetta, Swat, Multan, Badin and the country’s other cities have witnessed the outages.

The Power Division said the country has been producing 17,000 megawatts of electricity while the demand has increased up to 19,000 megawatts. During the afternoon and evening timings, the demand went up to 21,000 megawatts.

Several areas of Karachi experienced outages up to 15 hours. The loadshedding-exempted areas of the city also witnessed the outages, while the loadshedding duration in different areas has been increased from eight to 15 hours.

The spokesperson for K-Electric said that the power supply had been disrupted due to the shortage of 300 megawatts from the national grid.

Meanwhile, Punjab’s urban areas experienced eight to nine hours of loadshedding, while the rural areas witnessed 10 to 12 hours of loadshedding.


But during their time there was no load shedding. In fact they fixed your payment issues to independent power plant projects and re-negotiated shitty expensive deals done by PMLN for kickbacks! They think everyone is an idiot!
 
.
We have a maintenance nightmare. Our trained sarkari crew has a habit of destroying things .... look at Steel Mill , HMC , machine tool factory, and the list goes on and on and on ..
This is not unique to oakistan
All govt entities are like this
Problem is pakistanis want corruption and are against "sarmyadar" neezam
 
.
They have investments on Sharif family.

There is a disturbing trend lately of Indians suddenly posting and taking sides in internal political threads of Pakistan.

Not just things that have external ramifications but stuff like this thread. Power policy, inflation, etc.

Tatti farak nai parta, hagty raen jo bhi dil krta a! Velay hen BC koi kam ni inko! :omghaha:
 
.
Back
Top Bottom