What's new

Congratulations: 50th JF-17 Thunder handed over to PAF

congrotulations * PAF *
my Best wishes for PAF will developed its own fighter jet engine
 
. . . .
240_99007_674310.jpg

240_99009_804391.jpg

240_99010_381719.jpg

240_98968_695569.jpg

240_98967_603679.jpg

240_98963_600828.jpg

240_98961_145559.jpg

240_98972_674971.jpg

240_98973_164712.jpg

240_98977_859509.jpg
 
. . . . .
these are the people who give me the pride to be call my self pakistani may they be rewarded for there contributions towards my nation
 
. . .
JF-17 first squadron was completed in early 2010. Tejas first squadron won't be ready till late 2015 at the earliest. By then, JF-17 Block 2 would be introduced. Tejas still lacks DSI and MAWS, standard on JF-17 Block 1. JF-17 Block 2, which is in serial production, introduces AESA, IRST, wide angle holographic HUD.

Tejas cockpit

in_lca3_001.jpg


JF-17 Block 1 cockpit

cockpit4.jpg


JF-17 Block 2 cockpit

J-10B_cockpit.jpg

DSI is not criteria for a advance fighter & who says you that Tejas would not have MAWS
Any source for above bolded comments.
First develop 6 axis FCL in ADA language.
JF-17 thunder still does not have FOC.
 
.
Hello, i am writing for a french blog (though i'm not the main author) le portail des passionnés de l'aviation

We are qtarting atm a series of article about asian airplanes, one wasalready posted by the main author on j10.

As you can see it is a popularization blog. We would need a pakistani correspondent to write an article about JF17 (1 to 3000 words). Anyone would be interested in?

TY in advance for your answers.
 
. .
Back
Top Bottom