Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
America is already developing its 6th generation fighters. It is not too early for China to begin the R&D of its own 6th gen fighter. It is not wise to wait until your enemy has develop a new weapon before you begin. That is the sure way to lose.
Making a prototype and mass production is completely different? China says their J-20 will be in service around 2018-2020 and JSF is nowhere near induction phase. So I doubt either country will even start their research on 6th generation before 2020s? Bear in mind, another 20 years for prototype and first flight and another decade before they are commissioned?
Yes.Making a prototype and mass production is completely different?
F-35 squadrons are being formed. Not likely same for the J-20.China says their J-20 will be in service around 2018-2020 and JSF is nowhere near induction phase.
The US and partners had to re-wire EVERY SINGLE F-16. I transferred from the F-111 to the F-16 at the near end of that program. Praise be to Allah on that. Each F-16 became a 'hangar queen' for up to 60 days.Falcon Wire: F-16 Rewiring Program
All F-16 aircraft manufactured by Lockheed Martin prior to 2003 contain wire harnesses insulated with Aromatic Polyimide. This insulated wire is commonly known as "KAPTON" wire or, MIL-W-81381 wire. Traditionally, wire used in aircraft installation are typically identified by the insulation characteristics and further, is not life cycle specification controlled.
While in the beginning, KAPTON insulated wire was light weight and possessed great electrical and mechanical properties such as, abrasion and cut-through resistance, high temperature resistant and strength, time has proven to take a toll, making KAPTON susceptible to degradation, breakdown and ultimately, failure.
You are mistaken. The US is already deep into the technology exploration phase for the so called '6th gen' fighter.So I doubt either country will even start their research on 6th generation before 2020s? Bear in mind, another 20 years for prototype and first flight and another decade before they are commissioned?
You are mistaken. The USAF have been flying the F-16N (N for nuclear) out of Area 52 for years.Nuclear-powered jet engines were not feasible, and never will be.
They already tried it before.
J-20A to get induction in 2015,followed by J-20B 3-5 years later。
So it is time to get started on 6th gen。fighter jet。
Simple really。
J-20A to get induction in 2015,followed by J-20B 3-5 years later。
So it is time to get started on 6th gen。fighter jet。
Simple really。
You are mistaken. The USAF have been flying the F-16N (N for nuclear) out of Area 52 for years.