Kabira
BANNED
- Joined
- Jul 12, 2014
- Messages
- 14,383
- Reaction score
- -20
- Country
- Location
This project has nothing to do with China Australia Spat. Whoever wrote this article is a moron with no comprehension of ground realities. First of all most of the Thar Coal is not extractable which why Plant have to be built on the site where coal is first converted gas and then ignited. Although it can be used to make Gas, Diesel and other chemicals used in industry.
This isn't true, 105km railway track is being build to export thar coal to Karachi and Sahiwal plants.
KARACHI, (APP - UrduPoint / Pakistan Point News - 21st Feb, 2020 ) :A 105-kilometer railway line will be constructed from Chhor to Islamkot to transport coal from Thar Coal Field to Port Qasim and up-country, apart from launching coal to gas to urea and liquid projects, and installation of 1320 megawatts power plant in Thar Coal Block-VI under China Pakistan Economic Corridor (CPEC)-related projects.
https://www.urdupoint.com/en/pakistan/105km-railway-track-to-be-laid-from-chhor-to-843839.html