China, Pakistan reach secret nuclear reactor deal for Pakistan

China, Pakistan reach secret nuclear reactor deal for Pakistan

The impact of one word .

There is no "secret" deal........there just a deal....am sure i read about this nuclear contract few years ago.

There is already a contract for the Chasma 3 and 4 reactors. Both reactors are due to be commissioned in 2016 and 2017 respectively. Their capacities are 385 MW each not 1000 MW.

@Topic They say in punjabi that Amrikiyaan noon chamooray larday nay paye.
 
. . . .
I thought the gf provision allows existing projects to run their course, not the addition of new ones.

China claims the contract was signed before sanctions but its only getting executed now n early reports said its a 385MW reactor n not a 1000MW...:)

Now the problem is if it turns out to be a 1000MW reactor, idk how China will justify that as China itself didn't had the capability of 1000MW reactor back then...:azn:
 
. .
Pakistan needs 20 of these 1000 Megawatt nuclear reactors because we have a short fall of 20,000 megawatt electricity. Keep them coming China, we could really use these reactors to meet our energy needs.
 
. .
Pakistan needs 20 of these 1000 Megawatt nuclear reactors because we have a short fall of 20,000 megawatt electricity. Keep them coming China, we could really use these reactors to meet our energy needs.

Way to go, Pakistan is in dire need of more power plants.

Yep, Pakistan needs more and more reactors, a Chernobyl 2 in the making. :disagree:
 
. .
Pakistan needs 20 of these 1000 Megawatt nuclear reactors because we have a short fall of 20,000 megawatt electricity. Keep them coming China, we could really use these reactors to meet our energy needs.

Do u have source for ur claim bcoz AFAIK 20 GW is the total installed capacity of n shortfall is around 7-8 GW(if i rem correctly).:)

Besides the main reason for heavy shortfall is underutilization of ur installed capacity.

Regarding 20 GW of nuclear power, what were u smoking???

Do u even know how much money will be involved to fulfill ur fantasy???

U guys r facing BoP problem n ur planning to import 20 GW nuke reactors...:enjoy:

BTW whose gonna provide u fuel for those 20GW reactors, have u thought about that...:what:
 
.
Its just propaganda, as the withdrawal of US from Afghanistan is getting near, we will see such reports popping up in Western media. Even if China is providing Pakistan with civil nuclear technology, whats the big deal? If USA can violate Nuclear Supplier's Group and NPT regulations, while signing Nuclear Technology agreement with India, so can China.

The problem with US is that they themselves violate international laws and treaties and still want other to follow them. Any way, NPT and other nuclear non-proliferation treaties are obsolete, as now Pakistan, India and North Korea are also declared nuclear weapon states and Israel is also no more a secret. New international treaty should be fair and treat member countries equally. US has already fucked up the existing treaties with their double standards.
 
.
There is already a contract for the Chasma 3 and 4 reactors. Both reactors are due to be commissioned in 2016 and 2017 respectively. Their capacities are 385 MW each not 1000 MW.

@Topic They say in punjabi that Amrikiyaan noon chamooray larday nay paye.

chasma 3 is already underconstruction
the 1000MV should the proposed chashma 5
 
.
chasma 3 is already underconstruction
the 1000MV should the proposed chashma 5

Karachi to have another N-plant | The Nation

This news is from last year and tells us everything about our Civilian nuclear power projects. According to this 1000MW is supposed to be built to replace Kanup-1 in karachi. Americans really suck at journalism.
 
. .