JSCh
ELITE MEMBER
- Joined
- Jun 9, 2011
- Messages
- 13,235
- Reaction score
- 2
- Country
- Location
This time is for real. World's 1st industrial-scale demonstration plant with a high-temperature gas-cooled reactor with a pebble-bed module, at Shidaowan Nuclear Power Plant, was connected to the national grid network.
China puts pioneering 'pebble bed' nuclear reactor into operation
China has launched a new high-temperature gas-cooled nuclear plant in the eastern coastal province of Shandong, the first to make use of 'pebble bed reactor' (PBR) technology developed by state-run China National Nuclear Corporation (CNNC).www.reuters.com
科技日报
来自 微博 weibo.com
#科技新突破#【全球首座球床模块式高温气冷堆首次实现双堆初始满功率运行】12月9日,国家科技重大专项——华能石岛湾高温气冷堆示范工程1、2号反应堆达到初始满功率,实现了“两堆带一机”模式下的稳定运行。
初始满功率是指在目前反应堆堆芯混合燃料装载状态下达到的额定运行功率,这一运行状态验证了示范工程所有系统均满足设计功能,为工程投产商运奠定了基础。
据了解,华能石岛湾高温气冷堆示范工程是全球首座球床模块式高温气冷堆,也是我国具有自主知识产权的第四代核电项目。中国华能联合清华大学及中核集团等单位开展科技攻关,实现双堆初始满功率运行目标,检验了高温气冷堆“两堆带一机”模式下运行控制能力,为今后商业化运行打下基础。(彭帅 柳田 科技日报实习记者 都芃 图片来源:中国华能)
Science and technology daily
22-12-9 17:50 from Weibo
[The world's first industrial-scale high-temperature gas-cooled reactor with pebble bed module achieves initial full-power operation of dual reactors for the first time]
On December 9, the No. 1 and No. 2 reactors of Huaneng Shidaowan High Temperature Gas-Cooled Reactor Demonstration Project, a major national science and technology project, reached their initial full power, realizing stable operation under the mode of "two reactors with one turbine".
Initial full power refers to the current reactor core with mixed fuel loaded reaches the rated operating power, this operating state has verified that all systems of the demonstration project meet its design functions, laying the foundation for future commercial operation.
It is understood that the Huaneng Shidaowan high-temperature gas-cooled reactor demonstration project is the world's first pebble bed modular high-temperature gas-cooled reactor, and it is also a fourth-generation nuclear power project with independent intellectual property rights. China Huaneng cooperated with Tsinghua University and China National Nuclear Corporation to carry out scientific and technological research, achieved the initial full-power operation target of the dual reactors, and tested the operation control capability of the high-temperature gas-cooled reactor in the "two reactors with one turbine" mode, laying the foundation for future commercial operation. (Peng Shuai, Liu Tian, intern reporter of Science and Technology Daily, Du Peng Photo source: China Huaneng)
Last edited: