What's new

Bangladesh Army

That's a lot of money..... Where is acquisition of tanks in terms of priority over potent planes for BAF or subs for BN
 
That's a lot of money..... Where is acquisition of tanks in terms of priority over potent planes for BAF or subs for BN
different budget. BD arrmed forces have big long-term plan.
about $25 billion defence purchase budget for next 15-17 years ;)
 
1. the existing units (around 250) will be upgraded into Type59BD + around 300 more units of Type59G will be purchased and upgraded into Type59BD.
2. Amphibious tanks yet to be come in light in the world lol

1.So,Almost 550 units.
2.I meant Light tank like Scorepeon and amphibious tank like type 63.lol.


$3.5-$4 million each so probably $1.2 billion max

2 million each with upgrade at max.Bd bought MBT2000 in $4 million each.Most of those tanks will be coming at a token price from friendly nations.Anyway it's an stupid idea to buy old junk.Junk is still a junk,no matter how much paint or decoration you put on them.
 
1.So,Almost 550 units.
2.I meant Light tank like Scorepeon and amphibious tank like type 63.lol.




2 million each with upgrade at max.Bd bought MBT2000 in $4 million each.Most of those tanks will be coming at a token price from friendly nations.Anyway it's an stupid idea to buy old junk.Junk is still a junk,no matter how much paint or decoration you put on them.
1. no need of another category of tank, I vote for ATOM IFV :devil:
2. MBT2000 cost around $3.5 million. no junk will be bought. Type59G new varient but BD wants to upgrade it further.
Will be cost around $3.5 million most probably in total per tank
btw T-14 tank also in the card (cost around $3.7 million)
 
Tanks like subs and fighter aircraft, are offensive eqpt. It is not money that is a constrain, given our small requirement. The hindrance is political where the current BAL/SHW govt cannot afford to offend their master.
 
1. no need of another category of tank, I vote for ATOM IFV :devil:
2. MBT2000 cost around $3.5 million. no junk will be bought. Type59G new varient but BD wants to upgrade it further.
Will be cost around $3.5 million most probably in total per tank
btw T-14 tank also in the card (cost around $3.7 million)

1.BD already choosed Lazar.Discussion was on the table,then no news. I would like to see ATOM!May be Russia will give us assembly and Overhauling right,like they did with BTR80? But I don't think BD will go for IFV so fast.There is plenty of BTR in surplus from UN missions.They will run out the existing number first. And with 300 BTR 82's on order under TOT.
They won't sell us T-14 this soon,if they do the price will be higher.And we don't need them,they are unsuitable for our strategy.We want deterrence not offense.

2.Sorry,my bad. But as far as i know they were $4million each,and the money were paid form Disaster management Bureau's fund.Only 1-2 month before Rana Plaza Tragedy.

3.Type 59G isn't new production. They are the Chinese upgrade for existing Type 59 fleet up to Type 99G standard.This variant will be little tweaked according to BD's need and will be designated Type 59BD.
 
1.BD already choosed Lazar.Discussion was on the table,then no news. I would like to see ATOM!May be Russia will give us assembly and Overhauling right,like they did with BTR80? But I don't think BD will go for IFV so fast.There is plenty of BTR in surplus from UN missions.They will run out the existing number first. And with 300 BTR 82's on order under TOT.
They won't sell us T-14 this soon,if they do the price will be higher.And we don't need them,they are unsuitable for our strategy.We want deterrence not offense.

2.Sorry,my bad. But as far as i know they were $4million each,and the money were paid form Disaster management Bureau's fund.Only 1-2 month before Rana Plaza Tragedy.

3.Type 59G isn't new production. They are the Chinese upgrade for existing Type 59 fleet up to Type 99G standard.This variant will be little tweaked according to BD's need and will be designated Type 59BD.
1. Lasar is MRAP , different platform, BTR-82A also different platform- armored personal carrier.
2. T-14 is already in export offer.
3. That is Type59D not Type59G
 
1. Lasar is MRAP , different platform, BTR-82A also different platform- armored personal carrier.
2. T-14 is already in export offer.
3. That is Type59D not Type59G

1.Sorry my bad again.Anyway.

2.Price will be higher.$3.5 is the price for Russian Army.Now you don't expect them to sell you with that much discount?? And the weight is what 48-50 tons? It was a great reason BA decided to upgrade their junk Type 59 and 69's.

3.Brother,the production had stopped in '85 with nearly 10,000 unit built.There are thousands in surplus storage. BD will buy them from surplus and then upgrade them to BD standard which is Type 99G standard.
Type 59 D was a upgrade version with a 105mm gun and night vision system.

These are very public information.
 
Buying or building drones is not an impossible or tough thing.

They have to be a lot tougher/larger and/or survivable than your regular Radio Control toys (longer range radio plus more sophisticated sensors and transmitters). And the electronics has to be jamming-resistant.

This is an RQ-11 Raven for reconnaissance.

It's one of the smaller drones and is based on a proven R/C aircraft design.
i want to start indiginous development and building.the more we develop- the more we became self sufficent. example the differance betwen india and china.
 
gallery_1_168_44238.jpg
12049198_860717567369692_6753722899384124922_n.jpg
12111915_494665810694291_898228329220356994_n.jpg
12193866_494665814027624_5404624383260207067_n.jpg
 
President opens Army Data and Computerised War Game Centre

President Abdul Hamid on Sunday inaugurated the Army Data Centre and Computerised War Game Centre at Dhaka Cantonment, which are expected to play an important role in achieving the 'Forces Goal' by 2030.The President first inaugurated the Army Data Centre. Director of IT Directorate Brig Gen Mohammad Omar Zahid briefed the President about different aspects of the Data Centre.Earlier, on his arrival at the Data Centre, the President was received by Chief of Army Staff General Abu Belal Muhammad Shafiul Huq. Later, Abdul Hamid inaugurated the Computerised War Game Centre.

Acting GOC of ARTDOC Maj Gen Jahangir Kabir Talukder briefed the President about its aspects and strategies.Speaking on the occasion, the President said the inauguration of the Data Centre and the Computerised War Game Centre are two milestones when it comes to Bangladesh Army's technological advancement.

Hamid said, "The ability of taking flawless war strategies during the critical situation of a war is the reflection of professional efficiency of army commanders. And in the technology-based world, events are fast-changing and multi-dimensional ones."The President said any victory and defeat or any success and failure largely depends on taking timely and right decisions and formulating plans. "So, it's urgent to combine the technology-based operational assessment with the real experience and knowledge in drafting plans and taking decision."He said the role of technology-based Computerised War Game Centre and timely simulation system is important for development and contingency planning by brigade and division level commanders. "I think the induction of the war game centre in the army is a big advancement for enhancing the professional efficiency."The President observed that the induction of Army Data Centre is a unique example that Bangladesh Army is no longer lagging behind in using technology keeping pace with globalisation.


President opens Army Data and Computerised War Game Centre - The New Nation
 

Latest posts

Pakistan Defence Latest Posts

Pakistan Affairs Latest Posts

Back
Top Bottom