we don't even have a prototype yet, be patientso when wil altay in service i cant wait
I am not sure about OTOKAR capabilities but BMC will set up new production center in Marmara region.Most probably Otokar will do the same if their current production capabilities cannot correspond the needs.How you guys considering of 50 Altay for a year ?
It's can't be about production capabilities.
I am not sure about OTOKAR capabilities but BMC will set up new production center in Marmara region.Most probably Otokar will do the same if their current production capabilities cannot correspond the needs.
Maybe the best choice will be share the tender in twice and let BMC and Otokar produce them all, in terms of speed up production and support domestic industrial companies as much as you can.
Current facility of OTOKAR can product 1000 heavy armored and 6000 armored tactic vehicles at the same time. Maybe more than this, but not less i am sure.I am not sure about OTOKAR capabilities but BMC will set up new production center in Marmara region.Most probably Otokar will do the same if their current production capabilities cannot correspond the needs.
Maybe the best choice will be share the tender in twice and let BMC and Otokar produce them all, in terms of speed up production and support domestic industrial companies as much as you can.
In production there is 1 significant variant which is more important then others is time. If we need short term delivery, I think it should be no big unit cost differences when we split tender into two portion.(maybe three >could be FNSS)Current facility of OTOKAR can product 1000 heavy armored and 6000 armored tactic vehicles at the same time. Maybe more than this, but not less i am sure.
Sharing wouldn't be great for the unit cost. One of them can easily product 100 Altay in a year. This is the best number i think.
That choice seems impossible to me. You know the TSK..In production there is 1 significant variant which is more important then others is time. If we need short term delivery, I think it should be no big unit cost differences when we split tender into two portion.(maybe three >could be FNSS)
The matter is time and such kind of current environment in TR ,I think we cannot wait longer.