What's new

Akinci & Aksungur and Turkish Unmanned Fighter Aircraft Program

For this Ateist dog TROLL you want it ?

o-BASHAR-ALASSAD-FILE-facebook.jpg


you will get it in 2016

Turkey can become regional leader in 2016, says report | Fulton News

With domestic political uncertainties cleared up, Turkey is 'most critical player to watch' in 2016, says Stratfor's annual forecast

I bet my mustache, we will do without entering Mare Corridor


08879.jpg


Russian Intelligence uses 822 LOL :)) as search acronym ;
Google says how often it was searched :usflag:

46 meter wing spang, thats what TAI will build for MIT.
 
.
ms4_zpsfvzgand2.jpg

SSIK Kararindan Sozlesme Asamasina iki adet proje var!
ANKAyla alakalari yok? 2011 de sanki ozellikle KARAYEL ve BAYRAKTAR devereye girip acigi kapatmislar.
in 2011 started GIHA
in 2012 started Taarruzi IHA
GIHA ve Taaruzi IHA ne demektir?


Like this?
20140629000104_0-500x320.jpg

Barracuda-Stealth-UAV-1-640x449.jpg

2-talarion-uav.jpg



bu haritada yapacağımız sistemleri sadece temsili olarak konulan yabancı uav karşılıkları var =)

uavs.png
 
. . . .
I believe in it. Phase 8 and the comments of SSM are serious hints for it.

The cooperation with BAE will obviously be not alone TF-X.

In Phase 8 it look like we go for a two Engined UCAV which is a greater Plattform than Taranis or other demonstrators. It will have more Payload and Fuel Capacity, which mean more Range !
 
.
I believe in it. Phase 8 and the comments of SSM are serious hints for it.

The cooperation with BAE will obviously be not alone TF-X.

BAE is UAE? If so, I am suspicious about this. It's the most anti-Turkey country in Gulf region. I will be surprised if we will cooperate with them.
 
. . .
requirements of these project is changing continuously...

Now they want ANKA to be HALE?

I miss the old SSM
 
. . .
That is the downside of having civillians have too much say in these projects. The need of the TSK may change, but you will never accumulate wisdom or experience if you do not complete existing projects and learn from your mistakes. Constantly changing the specs to your needs is similar to saying "gee I need a new computer, but I will wait, ½ year more because then a better one will be available, and I can get more for my money".
 
.
Why do you miss? RQ-4 Global Hawk more cool than HARON:)
rq4_func_1.gif
I'd rather have the current projects to be finished. Indians wanted every shiny thing to be on Arjun and it took a million years to finish the project.

First they wanted a SATCOM antenna, now they want it to become HALE... tomorrow they'll say "let's make it stealth"
and the project that should be over in 2015 will be over by 2023. That's dumb.
That project is seperate from the current MALE one from what i understand.
I hope so bro

I just want a goddamn production model.
Enough prototypes.
 
. .

Pakistan Defence Latest Posts

Pakistan Affairs Latest Posts

Back
Top Bottom