Oublious
SENIOR MEMBER
- Joined
- Jun 23, 2012
- Messages
- 7,567
- Reaction score
- -3
- Country
- Location
No way, the two country would pay billions of dollar and still buy it from America. fake news.
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Many people currently think that TAI's MMU, as an indigenous platform, has the highest degree of secrecy among the TAI projects. This is mostly true, however, the UAV department is preparing for a big show starting from the coming days.
Flight tests of two different unmanned systems by TAI are expected to be shared in the coming days/months.
In addition to these highly classified projects, the TP version of AKSUNGUR is being prepared. And then there is JEMSAH, which has also been disclosed recent year. At least three systems will be introduced in 2023, and there is nothing about more that has yet been reflected in open sources. This information was also confirmed by SSB and TAI officials.
The first of these is the jet-powered UAVs launched from the UAV, of which you have already seen prototype images. JEMSAH is a supersonic autonomous UAV system being developed with a focus on Electronic Attack, air-launched decoy and SEAD, as well as Air Force training and testing activities.
The second, GOKSUNGUR, will be the largest member of the ANKA UAV group. It is a high-altitude mission-capable strategic UCAV with a considerably high payload cap.
The third is an unmanned combat aircraft, codenamed TISU in open sources. It is speculated that this system, unlike the Baykar KE, will have a more stealthy character and will basically be a penetrator bomber.
Before the end of 2022, we expect at least one of GOKSUNGUR or TISU will be available to see in open sources. But, 2023 will be the year of the Turkish aerospace industry's big trunk show under the leadership of industry leaders such as TAI, Baykar, Havelsan, Sage, etc.
Starting from this November, new systems or roll-out ceremonies, first flights and first system deliveries will take place almost every month for the next 36-48 months.
Only when you see the runway test video, you realise that its a big aircraft/drone.KIZILELMA : 14.70 m
KIZILELMA
Speed of mach 0,6 with AI-25TLT turbofan engine
Speed of mach 1.35 with AI-322F turbofan engine
View attachment 905332
V Tail and Wings
Fuselage
Command-control Shelters