What's new

Advanced Medium Combat Aircraft [AMCA] Development | Updates & Discussions.

. . .
Advanced because it is a 5G aircraft .

Medium as in weight category .


Earlier it was a MCA like LCA. Airforce change some GSQR and design changed so as the name. MCA conceived as a 2 engine Thrust victor Fin less aircraft. Design under go various grass root changes vefore reaching to the present one. prior design was this.

92838b78ee97c5cec97274860adbd720._.jpg


db471fecb3bc40e7078a82883a026483._.jpg
 
.
Earlier it was a MCA like LCA. Airforce change some GSQR and design changed so as the name. MCA conceived as a 2 engine Thrust victor Fin less aircraft. Design under go various grass root changes vefore reaching to the present one. prior design was this.

View attachment 129566

View attachment 129567

Thank God they never went along with MCA ....... It was too ambiguous and would have resulted in another delayed project .

MCA

19dfbb8e0cd0d2fe2f5397f4318bdfc1.jpg


451f35016f51c20816997a04c4602d81.jpg
 
.
AMCA Version 3B-08
8abc17605fac0984b3c1de47aa8a9a00.png


During the year 2014, the R&D divisions at NAL have significantly contributed towards the Advanced Medium Combat Aircraft
programme of Aeronautical Development Agency (ADA). The R&D efforts led to the new configuration AMCA-3B-08 and a structurally efficient wing layout with four bending attachment brackets and two shear attachment brackets. For the AMCA
3B-08, structural design, analysis and size optimization was carried out to cater for all critical symmetric and un-symmetric load cases. Finite element models were built separately for each of the fuselage segments and then integrated to build a full fuselage finite element model.

Source: Annual Report of the CSIR National Aerospace Laboratories for the year ended 31st March 2014.
 
. .
What's the point of having this thread, when India has decided to stall work on AMCA.
 
.
What's the point of having this thread, when India has decided to stall work on AMCA.

there is no stalling work is already on

the development agencies are being proactive

they are regulary doing concept studies and designs
 
.
What's the point of having this thread, when India has decided to stall work on AMCA.
Well it's clearly not stalled is it? Work is still going on simply, for now, more attention is being given (and rightfully so) to get the LCA Mk.2 in service and then more attention will go on the AMCA.
 
.
Well it's clearly not stalled is it? Work is still going on simply, for now, more attention is being given (and rightfully so) to get the LCA Mk.2 in service and then more attention will go on the AMCA.


Since the preliminary design of LCA MK2 is released, It is the time to focus on AMCA and LCA MK 3 with 6 ton weight and above 5.5 tons of weight carrying capability , stealth, Long range in excess of 3000 KM, Super cruise, AESA, High supersonic A TO A missile, precision strike weapons and bombs etc.
 
.
Since the preliminary design of LCA MK2 is released, It is the time to focus on AMCA and LCA MK 3 with 6 ton weight and above 5.5 tons of weight carrying capability , stealth, Long range in excess of 3000 KM, Super cruise, AESA, High supersonic A TO A missile, precision strike weapons and bombs etc.
when do u expect LCA mk2 to enter service?
 
.
They are still thinking Kaveri? That alone will kill the project. :-( Run the two separately at least, with a backup plan for the engine.
 
. . .

Pakistan Affairs Latest Posts

Back
Top Bottom