What's new

1st photo of the completed hull of the Scorpene submarine at MDL Mumbai.

proud_indian

FULL MEMBER
Joined
Dec 7, 2008
Messages
1,896
Reaction score
0
Country
India
Location
India
BwC-K_8CcAIfaWT.jpg:large
 
. . . . . . . . . .
Awesome :cheers:

But will the subs be launched in september'2015 or commissioned? because it was expected to be commissioned by 2016,if i m not mistaken. :unsure:

@sancho @Dillinger @Abingdonboy @SpArK


Is that underconstruction sub,second sub?? :unsure:
yes it's a cross sectional view of a constructed hull

Jaitley reviews progress of Project 75
Updated 6 minutes ago
(Unedited relase)

Raksha Mantri Shri Arun Jaitley accompanied by Admiral RK Dhowan Chief of the Naval Staff visited Mazagon Docks Limited, Mumbai today and reviewed the progress of the Project 75 (Indigenous submarine construction project) as well as the other ongoing warship building projects including P-15 B class stealth destroyers . The visit of Raksha Mantri, within 3 months of taking over amply demonstrates the importance being accorded by the Government to the indigenous construction of submarines and warships.
During his visit the Defence Minister inaugurated the Mazdock Modernisation Project (MMP), which would significantly enhance the warship and submarine construction capability of the shipyard. M/s Haskoning Nederland B.V. (HNBV), world renowned consultants in the field of marine construction, were appointed as consultant for this project. The major components created under MMP include a new Wet basin with level luffing cranes, 300-Ton Goliath Crane, Module Workshop, Stores Building, Shipyard transporter and Cradle & Assembly shop at a cost of Rs. 800 Crores approx.
It may be recalled that Project 75 submarine construction project is a very important project for the country and Indian Navy. 06 state-of-the-art submarines fitted with latest equipment are being built at MDL, Mumbai under collaboration with M/s DCNS France, giving a massive boost to the indigenous submarine construction capability of the country. With all the impediments & material hurdles resolved, the construction of the submarines is progressing on schedule to meet the planned delivery schedule of Sep 2016.
Presently, first three submarines of the project are in outfitting phase, and the systems of the first submarine are being ‘Set to Work’. The Project is being reviewed at regular intervals at all levels at Naval Headquarters and Ministry of Defence (MoD) to gear up for the launch of the first submarine in Sep 2015. Preparations to induct these submarines are in progress and the selected crew has commenced training. The submarines will be initially based at Mumbai and shifted to operational base at Karwar after completion of trials. Necessary impetus is also being given by the government to create associated shore support facilities as per the Long Term Infrastructure Perspective Plan (LTIPP).

link

10620613_625907824173213_960540536032173017_n.jpg
 
Last edited:
. . . .
That sub production facility of MDL's is very impressive- definitely hope such knowledge and world-class faculties aren't wasted now and that MDL plays a part in follow-on sub projects.
 
.

Pakistan Affairs Latest Posts

Back
Top Bottom