If ever...This Project, when completed, will be a huge relief for South Punjab
If ever...
1050mw of solar energy is so expensive and it works such a huge area that if we had invested The same money for coal fired power plants we could generate 2-3x more electricity in similar time period. Solar power is really good for domestic or private use but it is still very expensive at government level
If ever...
1050mw of solar energy is so expensive and it works such a huge area that if we had invested The same money for coal fired power plants we could generate 2-3x more electricity in similar time period. Solar power is really good for domestic or private use but it is still very expensive at government level
5,000 acres of land allocated for solar power projects
The Punjab government has decided to allocate 5,000 acres of land for private solar power projects in the Cholistan which will be allotted to solar power sector investors at a nominal rate of one dollar per acre per year for a 20-year lease.
Out of 5,000 acres of land, 2,500 acre land is situated in Maroot, Bahawalnagar and the rest of 2,500 acres land is located on Din Garh Road, Yazman, Bahawalpur.
Provincial Minister for Energy Sher Ali Khan told a delegation of China Power International, Beijing, headed by Wang Zhi Yin on Friday.
The minister informed the delegates that two grid stations of 66 KW each were already working in the vicinity of Maroot and Yazman under the national power transmission system which could be easily linked with the proposed coal fired power plants.
He said the Punjab government was ready to offer investment in hydro power generation, solar power generation and establishment of bio-mass fired power plants along with wind power plants and coal-fired power plants on the basis of build-operate-transfer basis, build-own-operate-transfer (BOOT) basis and on the basis of build-own and operate (BOO) also.
Six coal-fired power projects are already in the pipeline which would generate 420 MW of electricity, the minister added.
He requested the Chinese investors to consider installation of solar power projects in Cholistan. The government will provide them with the required land on lease under soft conditions besides giving total relaxation in sales tax on imported machinery which is not manufactured locally, he added.
He apprised the delegation of a 500-KV grid station and the coal fired power plant working at Rahim Yar Khan and said the Punjab government was negotiating with the federal government to collaborate in developing an energy corridor from Gadani to the Karachi costal area to facilitate inline transportation of imported coal to different areas of Punjab where the land required for-coal fired power generation will be leased on the market rate.
5,000 acres of land allocated for solar power projects | Pakistan Today | Latest news | Breaking news | Pakistan News | World news | Business | Sport and Multimedia
It has to do more with who is willing to put up money and who is not.Strange !!! why we need china for every project ? us canada france germany more advance in solar technologies?
2.2 Billion Dollars - > Only 1050 MW
Kala Bagh Dam -> 5 Billion -> 4000 MW -> You get water storage + free savings
Sound like we are wasting 1 Billion dollars