What's new

Work On the Third and Fourth Chashma Nuclear PowerPlant Underway

A.Rafay

ELITE MEMBER
Joined
Apr 25, 2012
Messages
11,400
Reaction score
10
Country
Pakistan
Location
Pakistan

This report provides updated facts and figures on the evolution of the national energy market. For the oil, gas, coal and power markets, the report details the market organisation, institutions regulating the market, and energy policy of the country. Energy companies active on the market are analysed. Domestic production, capacities, exchanges, consumption by sector and market shares are provided. Energy prices levels and taxes are described. Finally, the driving issues, and the market prospects are proposed.

Pakistan is suffering a massive power shortfall. However, many projects are currently launched. Construction of the Thar coal-fired power plant is expected to start soon. Many hydropower's dams are planned. An LNG terminal is currently being built.

Asia's craving for energy slowed down in 2011, with primary energy production increasing by 3.7% in 2011 from 7.1% in 2010 and primary energy consumption growing by 5.1% (6.4% in 2010). China kept running ahead (highest energy consumption in 2011, 19% above the United States), while India consolidated its position of world's third largest consumer and succeeded in lowering its energy consumption per unit of GDP to the world average. Japan was deeply impacted by the March 2011 events (-36% in primary energy production and -6.6% in primary energy consumption).

Read more here: DUBLIN: Research and Markets: Pakistan Energy Report - 2012: Work On the Third and Fourth Chashma Nuclear Power Plants Is Underway | Business Wire | Rock Hill Herald Online
 
.
when will he start production ?? and how much costly a nuclear power plant is ?
 
.

This report provides updated facts and figures on the evolution of the national energy market. For the oil, gas, coal and power markets, the report details the market organisation, institutions regulating the market, and energy policy of the country. Energy companies active on the market are analysed. Domestic production, capacities, exchanges, consumption by sector and market shares are provided. Energy prices levels and taxes are described. Finally, the driving issues, and the market prospects are proposed.

Pakistan is suffering a massive power shortfall. However, many projects are currently launched. Construction of the Thar coal-fired power plant is expected to start soon. Many hydropower's dams are planned. An LNG terminal is currently being built.

Asia's craving for energy slowed down in 2011, with primary energy production increasing by 3.7% in 2011 from 7.1% in 2010 and primary energy consumption growing by 5.1% (6.4% in 2010). China kept running ahead (highest energy consumption in 2011, 19% above the United States), while India consolidated its position of world's third largest consumer and succeeded in lowering its energy consumption per unit of GDP to the world average. Japan was deeply impacted by the March 2011 events (-36% in primary energy production and -6.6% in primary energy consumption).

Read more here: DUBLIN: Research and Markets: Pakistan Energy Report - 2012: Work On the Third and Fourth Chashma Nuclear Power Plants Is Underway | Business Wire | Rock Hill Herald Online

I wish that now the PAEC will open its eyes and look to partner with KRL on doing R&D on Thorium Based reactors that are 100% safe and environmentally friendly as well.
 
.

Country Latest Posts

Back
Top Bottom