Is is enough dabong or i should show you something else too.
ACHIEVEMENTS UNDER MUSHARAF:
REAL SECTOR
Real GDP Growth % 4.2
(1999) 7.0
(2007)
Agriculture Growth % 1.9
(1999) 5.0
(2007)
Large Scale Manufacturing % 3.6
(1999) 8.8
(2007)
Investment %of GDP 15.6
(1999) 23.0
(2007)
National Savings %of GDP 11.7
(1999) 18.0
(2007)
FISCAL SECTOR
Per Capita Income $ 438
(1999) 925
(2007)
Revenue Collection Billion Rs. 308.5
(1999) 846.4
(2007)
Fiscal Deficit % of GDP 6.1
(1999) 4.2(including earthquake expenditure )(2007)
Total Public debit % of GDP 100.4
(1999) 55.2
(2007)
EXTERNAL SECTOR
Exports Billion $ 7.5
(1999) 17.0
(2007)
Imports Billion $ 9.6
(1999) 27.0
(2007)
Remittances Billion $ 1.0
(1999) 3.5
(2007)
Foreign direct Investment $ Million 376.0
(1999) 4160
(2007)
Current Account Balance & of GDP -4.1
(1999) -5.0
(2007)
Foreign Exchange Reserves Billion $ 1.73
(1999) 16.39
(2007)
MONEY & CAPITAL MARKET
KSE index 100 index 1283
(1999) 13566.0
(2007)
Market Capatilization Rs. Billion 286.2 (5.7 $)
(1999) 3598 (59.2 $)
(2007)
PROJECTS STARTED :
1. Layari Express
2. Makran Coastal Highway
3. Gwadar-Khuzdar-Ratodero Road (M8)
4. lowari Tunnel
5. Gwader Deep Sea water port
6. Islamabad-Peshawar motorway (M1)
7. Pindi Bhatian- Faisalabad Motorway (M3)
8. Indus highway
9. Kohat Tunnel
10. Hala Moro (N5)
11. Karachi Bulk water Supply
12. Okara Lahore
13. Quetta Water Supply & Environmental Improvement
14. Fesibility of Bhasha Diamer Dam
15. Chashma Nuclear power project
16. Chashma Hydro power project
17. Ghazi brotha Hydro power project
18. 5th secondary transmission grids project
19. Mangla Dam Raising
20. Mirani Dam
21. Gomal Zam Dam
22. Greater Thal Canal
23. Kachhi Canal
24. rainee Canal
25. Extension RBOD from sehwan to sea RBOD-11
26. Chashma Right Bank Canal
Total Cost=456 bln Rs.
--
-I wonder what did your leaders did, oh yeh i remember the first looted this country & then Ran away.
Regards
Wilco