I don't have my answer based on "you thought so"
You'll need to give me Apples to Apples comparisons.
Not a single accusations of corruption were raised in the court of law against OLM.Hahaha off course there was no corruption. It just magically happens to be the most expensive Metro Train in the world. All the other major cities were a bunch of morons that they happened to build it much cheaper, even Delhi built it much cheaper although its a much bigger city. Also, Punjab Government didn't release the documents of all the transactions for the safety of the people because after all, transparency is horrible for accountability. Yup indeed, no corruption at all, after all that's the hallmark of PML-N. Hahaha hahaha
Peshawar metro bus is no where , whereas pindi metro is working owesum For the twin cities people.Just compare the cost of the Peshawar metro bus service with the Rawalpindi metro and you will know the difference. The same trend you will find here.
Not a single accusations of corruption were raised in the court of law against OLM.
Pti and PPP were using the environment and heritage card against the OLM because they had nothing to prove against corruption in this project.
Go and check the coat of metro tari. Projects under construction I. India and Bangladesh before passing nonsense comments about OLM cost.
i think so because i know so. i asked you check the distance between these 4 districts by yourself. it's no less then 115 km. but you are not ready to move your a** and do some research. heck, you even considered Peshawar circular project a " metro Bus"
Ok. then let it be that way.
........................................Lahore Apple ................................. Peshawar Apple............
total length......................... 27.5 km's. .....................................115 km's at least.
Track.....................................dual...................................................dual...................
Serving areas...................2 points of same city........................... 4 districts.............
Cost.................................... USD 1.6 billion dollars.................. USD 1.6 billion dollars.....
Design speed......................... 80 km/hr......................................... 160 km/hr
Operating speed.................... 45 km/hr......................................... 105 km/hr
Stops.........................................36...............................................at least 15-20 (not confirmed yet)
all other part of your Post was crap.
Even it this (Apple to apple comparison) is insufficient for you to understand. then please stop quoting me. as i can come down to your level to counter you. but i am allergic to bullshit..
I don't have to do shiit as I am not stupidly questioning everything. I do have common sense I can use. No two projects can be compared from a cost standpoint unless they are 100% identical. Adding flower beds alone would change the cost .
So do me a favor, post legal, certified documentation so we can compare apples to apples. Otherwise, its all bullshiit like it is on every other thread resulting in nothing but propaganda.
Also, one of your cousins banned me I believe. Tell him I said hey, he proved me how much propaganda takes place on here.
........................................Lahore Apple ................................. Peshawar Apple............
total length......................... 27.5 km's. .....................................115 km's at least.
Track.....................................dual...................................................dual...................
Serving areas...................2 points of same city........................... 4 districts.............
Cost.................................... USD 1.6 billion dollars.................. USD 1.6 billion dollars.....
Design speed......................... 80 km/hr......................................... 160 km/hr
Operating speed.................... 45 km/hr......................................... 105 km/hr
Stops.........................................36...............................................at least 15-20 (not confirmed yet)
Both Projects have different parameters and objectives ....BTW from where you get this figure? SPEED
operating speed....
BHae ap tau andar k banday niklay....
Well. as now you are on PDF. so apko b aik cheez start kar lene chaahye.. or wo hay research... Jis chez kay mutalik post karo usky mutalik research. mene to karle the tabhe post ki . aapko aitraz hay mere provided data pe to research karky mujhy ghalt sabit kardy. Dot
___________________________________
I don't have to do shiit as I am not stupidly questioning everything. I do have common sense I can use. No two projects can be compared from a cost standpoint unless they are 100% identical. Adding flower beds alone would change the cost .
So do me a favor, post legal, certified documentation so we can compare apples to apples. Otherwise, its all bullshiit like it is on every other thread resulting in nothing but propaganda.
Also, one of your cousins banned me I believe. Tell him I said hey, he proved me how much propaganda takes place on here.
your source of research seems to me some PTI Facebook Pages.
I don't have extra time to research it
i. Contract Price of Civil Works= USD 531,681,818
ii. Contract Price of Consultancy Services = USD 24,000,000
iii. Contract Price of E&M Works (inclusive of 6% Withholding/Income Tax) = USD 922,500,000
iv. Sub-total (a to c) = USD 1,478,181,818
v. Contingencies (only in case of unforeseen increase in work) = USD 147,818,182
vi. Total Price = USD 1,626,000,000
The final price of USD 1,478 Million is around 661 Million dollar less than the bid price
17. Chinese side agreed to sublet Civil Works of the project to Pakistan side resulting in significant savings, which is again an unprecedented achievement. Significant economies / price reductions achieved in E&M Work’s price. Effective negotiations yielded project cost savings of approximately USD 660,818,182/- with unprecedented support of the Chinese Government and gracious flexibility shown by CR-NORINCO. Further, transparent tendering process of Civil Works carried out by LDA yielded additional saving of PKR 5.97 Billion.
https://punjab.gov.pk/node/1059
Don't interfere in our internal mattersThank you! This is called a good post with good data in it.
@RealNapster : See above. If you had real experience in this industry, you'd just read it and know its right for an instance. Why? Just the way the order and details are listed. Then, there is a link so you could read more details about it there. Next time, when you write numbers, please provide them with details enough to do an assessment (and a link to the original documents). Otherwise, its all "hear-say".
I don't mind you being from one party and someone else from another. That is your democratic right and I don't care as I am not in Pakistan, nor do I go there unless I have an assignment (rarely in a few years for a week may be). But, I do have an issue with people lying off their rears. That shouldn't happen or you should give enough data so people can agree with you. Thanks