I just wanted to raise a question , why is it that countries with Sanctions like our friends to west can build their own helicopters
Bell / Cobras
There is no reason why we should not have NEW helicopter being produced so we can phase out the retireing helicopters that are 20+ years old
Why is it that our Industry cannot manufacture a advance Helicopter for our national needs, if we too the 500-800million for refurbishment and instead invested that into a Helicopter production project would we not have self reliance in Helicopter production no different then what we have achieved with JF17 Thunder project
I am sure with certain assitance from China we can use their Engines and a universal airframe for the helicopter and develop something that can carry a gun , and missile launch and attack capability
Perhaps this could be something we can jointly produce with Egypt/China - If egypt signs the purchase agreement of JF17 thunders in large quantities ?
We already have the capabilities to develop missiles that can track and target, and hit with solid accuracy , we have the avionics integration experience working on Thunder project .....
We just need to arrange for the engines thru china , or produce one locally.
I am positive if we put our minds to the project we can achive great results
Lets look at the situation
a) We have engineers
b) We have mechanics that can operate engines
c) We have electrical engineers that can hook up circuits
d) We have Engineers also experienced in helicopter maintenence
e) We have ties with other countries to export in engines
f) We could also produce engines if we put our heads around to it
g) We already have the missiles and target and shoot knowledge
h) We already produce Italian radars locally under licence (I know its for planes but)
but I am sure we can find ways to developer things further
i) We have the reconicence perfected with UAV development , we can use those
same capabilities in helicopters exact same knowledge ....
We produce our own steel in steels mills and all the raw material needed to construct the body of the helicopter...
So really we should be flying our own helicopters - and not just wait to get helicopters
delivered to us after 4-6 years delays
Bell / Cobras
There is no reason why we should not have NEW helicopter being produced so we can phase out the retireing helicopters that are 20+ years old
Why is it that our Industry cannot manufacture a advance Helicopter for our national needs, if we too the 500-800million for refurbishment and instead invested that into a Helicopter production project would we not have self reliance in Helicopter production no different then what we have achieved with JF17 Thunder project
I am sure with certain assitance from China we can use their Engines and a universal airframe for the helicopter and develop something that can carry a gun , and missile launch and attack capability
Perhaps this could be something we can jointly produce with Egypt/China - If egypt signs the purchase agreement of JF17 thunders in large quantities ?
We already have the capabilities to develop missiles that can track and target, and hit with solid accuracy , we have the avionics integration experience working on Thunder project .....
We just need to arrange for the engines thru china , or produce one locally.
I am positive if we put our minds to the project we can achive great results
Lets look at the situation
a) We have engineers
b) We have mechanics that can operate engines
c) We have electrical engineers that can hook up circuits
d) We have Engineers also experienced in helicopter maintenence
e) We have ties with other countries to export in engines
f) We could also produce engines if we put our heads around to it
g) We already have the missiles and target and shoot knowledge
h) We already produce Italian radars locally under licence (I know its for planes but)
but I am sure we can find ways to developer things further
i) We have the reconicence perfected with UAV development , we can use those
same capabilities in helicopters exact same knowledge ....
We produce our own steel in steels mills and all the raw material needed to construct the body of the helicopter...
So really we should be flying our own helicopters - and not just wait to get helicopters
delivered to us after 4-6 years delays