TopCat
ELITE MEMBER
- Joined
- Nov 20, 2008
- Messages
- 15,736
- Reaction score
- -3
- Country
- Location
how come such a huge cost??
Some 1000 hectare land is to be acquired and The project will include 6.15 km long and 21.10 m wide bridge, 15.1 km of approach roads, toll plazas and service areas.....in sabke liye $3bn??
Because river is 90 meter deep. from the bottom of the river you need another 150 meter deep piling due to heavy current and force of the water which is 90 meter tall.. (so every pillar will be 240 meter tall). I am just giving you an idea without giving complex calculation of force that will exert on the bridge.