Wapda Decides To Give Rs98 Billion For Diamer Bhasha and Mohmand Dams From Its Own Resources


This government is more into taking care of its image, no matter how it harms the country. he says gove has no money and the aam awaam has to pitch in. The response he pathetic.. He sought 30 billion PKR every month, but got only 8.4 Billion PKR in return. So what does he do? Ask wapda to put government money intot he Dam fund. What a joke. Shows the caliber and mindset of this person. His own ego comes before the country for which he will U-Turns after U turns.
30b/yr but ur urdu is weak so i can forgive u and got 10b in 3months

Whole dam cost is 300 billion (150b already paid/arrnaged by wapda own funds) So what is he gona do with 30b/month..build 5 dams?

For god sake ... Get finance for dam constructions. Many monetary bodies will be willing to.finance the project.

Stop this birbal ki khichadi style crowd funding..
Financial already arranged ..ECC approved the dam at 485b. 300b will be financed by finance ministry while 185b is the amount already spent+ wapda own funds

Asian bank and world bank withdrew due to fiercely lobbying by india

This doesnt include power part (turbines ) those will be added later..but even if not added its estimated that it will produce 6-8 billion extra units via water management in downwards 12000 mw hydro plants (6000 tarbela; expected 2023, 4000 dasu expected 2025, 1400GB)

Tarbela currently stands at 5300mw extension 5 to 6300 mw in 2023 while dasu stage 1 will be completed in 2023(2000mw) stage 2 4000 by 2025

it has resources?
It sells 8000mw hydro power
 
.
30b/yr but ur urdu is weak so i can forgive u and got 10b in 3months

Whole dam cost is 300 billion (150b already paid/arrnaged by wapda own funds) So what is he gona do with 30b/month..build 5 dams?


Financial already arranged ..ECC approved the dam at 485b. 300b will be financed by finance ministry while 185b is the amount already spent+ wapda own funds

Asian bank and world bank withdrew due to fiercely lobbying by india

This doesnt include power part (turbines ) those will be added later..but even if not added its estimated that it will produce 6-8 billion extra units via water management in downwards 12000 mw hydro plants (6000 tarbela; expected 2023, 4000 dasu expected 2025, 1400GB)

Tarbela currently stands at 5300mw extension 5 to 6300 mw in 2023 while dasu stage 1 will be completed in 2023(2000mw) stage 2 4000 by 2025


It sells 8000mw hydro power
Really ? What about china ? They also did it for india ? The dam is pipe line since many decades because of india. ?
 
.
30b/yr but ur urdu is weak so i can forgive u and got 10b in 3months

Whole dam cost is 300 billion (150b already paid/arrnaged by wapda own funds) So what is he gona do with 30b/month..build 5 dams?


Financial already arranged ..ECC approved the dam at 485b. 300b will be financed by finance ministry while 185b is the amount already spent+ wapda own funds

Asian bank and world bank withdrew due to fiercely lobbying by india

This doesnt include power part (turbines ) those will be added later..but even if not added its estimated that it will produce 6-8 billion extra units via water management in downwards 12000 mw hydro plants (6000 tarbela; expected 2023, 4000 dasu expected 2025, 1400GB)

Tarbela currently stands at 5300mw extension 5 to 6300 mw in 2023 while dasu stage 1 will be completed in 2023(2000mw) stage 2 4000 by 2025


It sells 8000mw hydro power

Do your math properly. Step 1 what is the value of 1 billions dollars and how many PKR would you need to get that amount. Now keep in mind you need 8 billion dollars for dam and 12 billion dollars with electricity situation. But I think I am expecting miracles here.
 
.
Do your math properly. Step 1 what is the value of 1 billions dollars and how many PKR would you need to get that amount. Now keep in mind you need 8 billion dollars for dam and 12 billion dollars with electricity situation. But I think I am expecting miracles here.

Dam is not built with foreign money..it's built with rupees.how idiotic can one be..for example devaluation doesnt impact cement or labour costs..

485 b cost has been approved doesnt contain much foreign part has electrical work is not part of the project ..thid cost also contain cost escalation of 10%..

Really ? What about china ? They also did it for india ? The dam is pipe line since many decades because of india. ?

You know what PC 1&2 MEANS? Its details of cost of project every rupee is counted and estimated.

Dam is pipeline dream because political parties think spending this money on roads gains more votes than dams

India simply objected and said it will go for litigation if AB WB decided to funs the dam....thus unlike dasu , tarbela project(IV V 2800MW, 100% funded by WB/WAPDA) bhasha has to be funded by govt...

So current govt approved the project with cost of 485 b(300b rs which means spending 5% of PSDP/ fed development fund) (40/yr in 800b)

China was never involved in dam as Pakistan wants full controll over water release schedule that will effect power production for it to be build by private investment

I hope i used easy language for children here
Obsessed with dams..ghosh how many Pakistani are obsessed with indian dams

The 12b dollars figure comes with earlier model of building full dam with AB, WAPDA and comerical loans thus includes cost of electrical work, transmission line and interest cost over 20yrs

All this info is available in public domain..so plesse google it
 
.
Dam is not built with foreign money..it's built with rupees.how idiotic can one be..for example devaluation doesnt impact cement or labour costs..

485 b cost has been approved doesnt contain much foreign part has electrical work is not part of the project ..thid cost also contain cost escalation of 10%..



You know what PC 1&2 MEANS? Its details of cost of project every rupee is counted and estimated.

Dam is pipeline dream because political parties think spending this money on roads gains more votes than dams

India simply objected and said it will go for litigation if AB WB decided to funs the dam....thus unlike dasu , tarbela project(IV V 2800MW, 100% funded by WB/WAPDA) bhasha has to be funded by govt...

So current govt approved the project with cost of 485 b(300b rs which means spending 5% of PSDP/ fed development fund) (40/yr in 800b)

China was never involved in dam as Pakistan wants full controll over water release schedule that will effect power production for it to be build by private investment

I hope i used easy language for children here
Obsessed with dams..ghosh how many Pakistani are obsessed with indian dams

The 12b dollars figure comes with earlier model of building full dam with AB, WAPDA and comerical loans thus includes cost of electrical work, transmission line and interest cost over 20yrs

All this info is available in public domain..so plesse google it
A lot of stuff will need to get importrd specially when the electricity generation part comes into play, that is where the dollar comes in.
 
.
A lot of stuff will need to get importrd specially when the electricity generation part comes into play, that is where the dollar comes in.
Not many stuff for basic dam part..but PC 1 has 10% cost escalation that should cover it..yeah it still possible it might slightly over shoot

You can get private investment easily once dam is build..or get govt to govt deals..e.g their was France and austria ready to fully fund tarbela V if there construction agency are given deals...
 
.