I always said, dont read half of the story.
I swear half (or more) of our time is spent responding to inane questions from these idiot false-flaggers, attention-seeking trolls and desi information-whores who are too lazy to use Google. I have completed 'ignoring' all of them by now, and don't waste my time in this manner. Who owes answers to these morons??
any plans from not getting it flooded as bd is underwater ..........
Not all of Bangladesh soil condition is a wet droopy mess you know.
Northern part of Dhaka (Savar, Tangail) is actually pretty old red soil structure and not even alluvial soil. In any case, runoff water management and waterproofing in wet season is part of the project scope.
My guess is that the construction will be 'cut and cover' instead of 'tunnel boring'.
One line by 2020 and two lines by 2026....Don't like the pace at all. And they plan on finishing all the lines by 2030.
Well don't be so quick to diss the pace in Bangladesh, bad mouthing our own. Some Indian projects like for example, MMRCA (underground) in Mumbai started in 2013 and will be completed in 2021 (eight years planned, may possibly be delayed further). Similar paces like eight to ten years for underground metro projects around the world are normal.
Now a warning to trolls, false-flaggers and Sanghis, don't start off-topic posts discussing MMRCA and how great it is - this is not the thread, nor the subforum for it. I will promptly report your off topic posts and a ban will be forthcoming from the mods.
A link to a separate thread for MMRCA is fine.
MMRCA was just an on-hand example I used - like dozens around the world just to show the average gestation period of these projects.