What's new

Type 075 Landing Helicopter Dock (LHD) News & Discussions

I'm afraid 076 won't be that fast.
Once the EMALS is installed on CV-03, it won't be a problem with 076.
The technology is ready.
The 20MW Turbo Generator is ready for installation or perhaps it has already been installed and tested on 055.
A 30MW version was rumored years ago.
 
.
August 12, 2020
66826808gy1ghoh4aamaij21120u5n7t.jpg
66826808gy1ghoh4b6allj21220ouahc.jpg

Via @卫星图像发烧员 from Weibo
 
. . . . . . . . . . . . . .

Pakistan Defence Latest Posts

Pakistan Affairs Latest Posts

Back
Top Bottom