clibra
FULL MEMBER
- Joined
- Feb 28, 2014
- Messages
- 159
- Reaction score
- 1
- Country
- Location
Type 054B FFG is coming soon.
let's input information and discuss in this entry.
According to big shrimp slyerhuahua, the 054B FFG design has been finalized and ready for construction.
Feature : Integrated Power System(IPS), almost 5000 tons of displacement, ...
https://lt.cjdby.net/forum.php?mod=viewthread&tid=2407005
sketch of 054B (by slyerhuahua)
rough CG (by baoxiuyuan)
The superstructure model of 054B in Wuhan 701 Institute.
let's input information and discuss in this entry.
According to big shrimp slyerhuahua, the 054B FFG design has been finalized and ready for construction.
Feature : Integrated Power System(IPS), almost 5000 tons of displacement, ...
https://lt.cjdby.net/forum.php?mod=viewthread&tid=2407005
sketch of 054B (by slyerhuahua)
rough CG (by baoxiuyuan)
The superstructure model of 054B in Wuhan 701 Institute.