What's new

Turkish Naval Programs

Can some one do me a massive favour and translate that projection post ?

Where does it say second LHD ? Also did I read that correctly it says 4 x LST,?
 
.
So no project studies for some Destroyer in the 12-14000t range in this incoming 15-20 years?
 
.
Can some one do me a massive favour and translate that projection post ?

Where does it say second LHD ? Also did I read that correctly it says 4 x LST,?

34830B0D-9795-4A22-9FD5-C79B724EA29B.jpeg


I’m on my phone and can’t translate it sadly.
 
. . . . . . . . . .
Did I see correct or my eyes are wrong but I think they have finally modernized body armors employed on surface vessels when deployed on deck stations?
Its also the first time I see the "egg" helmet with navy personnel.
 
. .
But the last of the 4 Ada class already went into the water last July 2017 accompanied by laying of the keel of the 1st Istanbul class ?

Do you mean the sea trials are starting for F514 but fitting out is not yet complete

If that is the first module for Istanbul class what did they lay in July 2017?

Both images are old from July 2017


4th Ada
TbC2oRk.jpg


1st Istanbul keel
535zOpN.jpg


Second LHD delivery date 2025, interesting so they will immediately start building the second one after the first one is laid down and starts its testing phase if this is still correct.

I think the reason is simple as soon as the first unit leaves the dry dock and launched into the water the dry dock will be free for second unit to commence

Looks like keel for second LHD is going to be laid in 2021 or 22 straight after launch of 1st
 
.

Country Latest Posts

Back
Top Bottom