dBSPL
SENIOR MEMBER
- Joined
- Mar 2, 2018
- Messages
- 7,661
- Reaction score
- 28
- Country
- Location
There is no formal joint engine development program. The Korean engine and transmission will be used in the first batch of the Altay, but tests are ongoing on the indigenous engine and transmission developed by BMC for final production. Similarly, the turbofan used in unmanned systems and the ongoing procurement of turboshaft engines for helicopters are used as interim solutions due to the urgent need of the main systems. On the turbofan side, TEI-TF6000 with 10,000 lbf thrust is being prepared in the first stage. On the turboshaft side, work is underway to militarize the TS1400 engine.and so its seems like Ukraine and South Korea are the main partners in Turkish engine programs ?
I think its only fair that all Ukrainians technicians and engineers are settled in Turkey and work for the Turkish military to build core systems like engines
Turkey has done alot to help Ukraine and even selling the Ukrainian companies to Turkey would be good buy for Turkey
take full advantage of the situation its not a unfair advantage its called fair advantage
by 2030 I can see Turkey ahead of some of the most advanced European nations like Italy and Spain
by 2040 they can chase France, Germany and then UK
It will take 3-4 years on average for the tank diesel, tuboshaft and turbofan engines to be ready for mass production and for all standard test procedures to be completed. During this period, it is aimed not to disrupt platform-based system projects. Previous problems with MTU or LHTEC, often related to exports, have led to numerous projects being delayed or even export possibilities being restricted. Engines licensed from Korea and Ukraine have a stronger framework in this sense.