Bro, it's not wrong to call a failure, a failure.Well now we have two companies that have the know-how to develop Turbo Jet engines that will be integrated into their respective platforms. This is a good thing, in the end, what matters is that the project has found it's end and not given up on.
Much respect to the engineers that have worked on the project, well done to them.
"The Turbojet Engines Development Project of the Turkish Air Force (TuAF), cowering the design and manufacture of indigenous turbojet engines to power locally built cruise missiles, UAVs and jet powered target drones for TuAF, was launched by a Defence Industry Executive Committee (DIEC) decree on December 15, 2o1o, and during its January 5, 2o12 meeting, the DIEC, Turkeys top decision making body on defence industrial procurement, authorized the SSM to initiate negotiation with Kale Aero, which was selected as a candidate Main Contractor company towards contract award.
Under the terms of the contract, Kale Aero will design and manufacture around 1o turbojet engine prototypes under five phases and within 48 months and following the qualification tests they will be delivered to the TuAF. Serial Production of the indigenous turbojet engines will be performed under a separate contract. Kale Aero built indigenous turbojet engines will replace French Microturbo-made TR-40 turbojet engine currently used on Turkeys first indigenous Air Launched Cruise Missile (ALCM) dubbed as Stand-Off Munitions (SOM) and will lay the foundation for an integrated jet engine design and production capability for future projects, according to the ministry officials who were present at the signing ceremony. SOM ALCM is designed, developed and produced by TüBiTAK-SAGE, Defence Research and Development Institute of Turkey.
Speaking at the ceremony Head of the Technical and Chemistry Department of Kale Group Osman OKYAY said that indigenous turbojet engine will serve as the propulsion system for guided missiles and with minor modifications it can be used as a propulsion system for UAVs and small class aircraft. OKYAY also stressed that they are targeting to complete project within 48 months and under five phases namely; Requirement Analysis, Preliminary Design, Detailed Design, Prototype Manufacturing and Qualification and added Under the project 9 technical working groups will be formed and a total of 47 engineers, and academicians as well as 10 technicians will serve under these working groups. Under the project we will also collaborate with Istanbul Technical University and TüBiTAK. Within the scope of the project we will establish a new R&DE Laboratory, where the prototype manufacturing will take place and to perform a total of 26 comprehensive tests including 15 subsystem tests and 11 system tests."
This project ought have been completed in January 2016... And they delayed the project with 5-6 years...Instead of 4 years, it has been 9-10 years.
Let's not beat around the bush, KaleAero failed their duty catastrophically.
----------------------------------------------------------------------------------
Also, here is the interview, i have not listened yet but gonna listen now.