-SINAN-
BANNED
- Joined
- Feb 22, 2013
- Messages
- 16,746
- Reaction score
- 0
- Country
- Location
My first thought.I think it is Hisar A+O. 2018 is the expected serial production date of both.
Aselsan would be the main contractor, Roketsan will be the sub-contractor.But the missiles are from Roketsan I guess.
Won't take that much money for KORALI suppose "Koral".