But that timeline is simply impossible, ridiculous ... just look how long Hongdu needed to develop the L-15/JL-10 based on the same design.
Panavia Tornado development began 1970 maiden flight was 1974.
(Exceptless all platforms are further develeoped. That's fact.)
Nothing is ridicilous . Read my full post and bring it in correlation with TAI-CEO's announcement.
Temel Kotil mentioned the same date. M-346 is ready , that's my key argument.
https://www.manset24.com/bilim-ve-teknoloji/hurkustan-sonra-hurjet-de-geliyor-h18350.html
"TUSAŞ Genel Müdürü Temel Kotil, Hürjet’i ilk uçuş tarihini 2022 olduğunu açıklarken,
It could make it's first flight in 4-5 years, but of course it won't be ready just because it can fly. Lots of avionics+weapons to be installed and tested additional 2-3 years, and then additional 2-3 years to setup serial production line and produce jets.
I expect this project to give it's first serial production jets into Turkish Airforce inventory in next 8-10 years.
TAI CEO said that we have a full avionics and electronics package for HÜRJET ready.
In the article the mentioned data are exact the data of M-346 - Mach 1.2 Ceiling 45.000 feet