Vikramaditya has full capacity of 30 plane include ASW, utilty & support helicopter. you have to run with mix of these plane maximum you run only 20(plane)+10(heli). at a time we need max. 20 not 30.
yes at that point i agree with you as for the information it will close to 65000T QE class but may be india go for nuk. also coze we have the technology to built nuk power a/c. as per the statement giving by chairmen of Atomic Energy Anil Kakodkar. I m talking about IAC2 not IAC1.
minimum 7-8 yr.
Dnt understand which IAC you are talking abt coze IAC1 aready built in CS and commission at 2013-2014. with the max. capacity of around same as Vikramaditya has. and IAC2 which already is in design phase project may start at 2010-2011 when the Ist IAC launched.
Sorry I got it wrong for Goroshkov.
Now that INS vikramaditya and IAC 1 have a total fixed wing strength of 20+30(given 40 for IAC1). so that should more or less sort the equation of 45 Mig 29K.
Now with this fact I wonder that why IN at first place went for a 45000 carrier with 20 fixed wing capacity and didnt build IAC1 which is almost 40000 ton but with 30 fixed wing planes.
Now even they want 1 squadron of NLCA or 2. The question is they will not be flying from Gorky or IAC1 coz 45 jets will be for these two is what i belive.
As far as the RFI is concerned and if the RFI is for the second IAC. Then where will the NLCA will fit.
As far as I see its not at all feasible to even operate a single squadron of NLCA.
Looks like this RFI will actually kill the NLCA program and post they get these planes (like F-18/rafale etc) they will start playing with NLCA like IAF played for years....
Any one any light on this?