Three Indigenous Aircraft Carriers being built at the Cochin Shipyard

Tejas-MkII

FULL MEMBER
Joined
Sep 7, 2009
Messages
410
Reaction score
0
fullstory

Navy's hunt for new carrier-operated fighters begins

--------------------------------------------------------------------------------
Advertisement
Share Print E-mail Comment[ - ] Text [ + ]STAFF WRITER 9:32 HRS IST
New Delhi, Nov 29 (PTI) The Navy has launched a hunt for a new set of fighter jets to operate from the aircraft carriers it will have in service five to six years from now.

Navy sources said here today that the force has issued a Request for Information (RFI) to global aviation majors, including American Boeing, Russian MiG and French D'Assault, ahead of issuing a tender for the aircraft.

Though the RFI is of a 'generic' nature, it could ultimately lead to a tender (or Request for Proposal) and the initial requirement would be for 16 aircraft with provision for follow-up orders of up to 40 aircraft, sources said.

The deck-based aircraft are required by the Navy to operate from its three 40,000-tonne Indigenous Aircraft Carriers (IAC) being built at the Cochin Shipyard. The delivery of the first IAC is expected around 2015.:devil::woot::yahoo:
 
.
Three IAC after 2015,may be by 2025...

One Gorky or INS vikramaditya from russia..

One Brit Aircraft carrier , if deal came true..

then atleast 5 Carrier by 2025....:cheers:
 
.
The realtic figure is actually 3-4 till 2025.
We wont really go for British Carrier.

So we have Gorshkov in 2012 and then 2-3 Indian Carriers by 2025.

Still 4 carriers mean we will always have 2 carriers in sea, which is far batter than what Indian Navy could dream of in the last 30-40 Years.
 
.
I think only problem to get this carrier by 2025 is to much dependency on cochin shipyard...

And if IN went for nuclear one,well they should went for this, then it may take more time...

I can say one thing that IN is seriusly planning to get the blue water capability and power projection not only in IOR but also outside of IOR...
 
. .
The realtic figure is actually 3-4 till 2025.
We wont really go for British Carrier.

So we have Gorshkov in 2012 and then 2-3 Indian Carriers by 2025.

Still 4 carriers mean we will always have 2 carriers in sea, which is far batter than what Indian Navy could dream of in the last 30-40 Years.

It will be great if one of these or hopefully 2 have nuclear propulsion..,may not be in 2025 ,but by 2030(20 years) is very much possible ....
 
.
Are those diesel or nuclear powered ?.

First one is diesel ,but not so much sure about other 2..

If india have capability to build nuclear reactor for submarine then i don't think it would not be so much great deal to build one for an aircraft carrier....:azn:
 
.
It will be great if one of these or hopefully 2 have nuclear propulsion..,may not be in 2025 ,but by 2030(20 years) is very much possible ....

Well, Actually The Third IAC CAN have, though i dont think its planned.

IMO, If we can have an 80MW reactor for Arihant then 2x80MW reactors can be placed on a Aircraft carrier to meet the needs of get a larger Reactor as The size will be a lesser issue on an Large Ship Like ACC.

But this is purely a thought, if They start from Today, with a working reractor design + reactor + Conventional reactor design and ability in hand 10 Years is sufficient to make a Nuclear Powered Carrier.
 
.
If india have capability to build nuclear reactor for submarine then i don't think it would not be so much great deal to build one for an aircraft carrier....:azn:

Its shame to Arihant if we didn't made one nuclear powered.
 
.
Well, Actually The Third IAC CAN have, though i dont think its planned.

IMO, If we can have an 80MW reactor for Arihant then 2x80MW reactors can be placed on a Aircraft carrier to meet the needs of get a larger Reactor as The size will be a lesser issue on an Large Ship Like ACC.

But this is purely a thought, if They start from Today, with a working reractor design + reactor + Conventional reactor design and ability in hand 10 Years is sufficient to make a Nuclear Powered Carrier.


That's exactly i am saying if we can make a 80MW reactor for arihant than 2x80 or 160 or 200MW is very much possible for carrier and by 2025-2030 is very gettable target.:)
 
.
That's exactly i am saying if we can make a 80MW reactor for arihant than 2x80 or 160 or 200MW is very much possible for carrier and by 2025-2030 is very gettable target.:)

Yeah for sure.
No doubt we must have Nuclear Carriers Now.

India needs 3-8 Carriers to defend its Large coastline.
If they are Nuclear Powered Its an added Boon.
 
.
INS vikramaditya : 45000 Tons 140000 HP (~100 MW)
USS Nimitz: 100000 Tons 260000 HP (195 MW)
IAC 1: 40000 Tons 4xLM 2500 = (~130000 HP 95 MW)

I think we are much capable for building Nuke reactor for carrier of displacement from 45000 - 65000 Tons...
 
Last edited:
.
What ever carriers india is going to get are not for power projection but to defend the coastal line and indian ocean region.
India needs at least 3 carriers operating in Indian ocean by 2020 we will get them. I don't see any reason why they need RFP for new carrier operating Aircrafts while we already have MIG29's and tejas
 
.
there is a rumor that India is discussing the purchase of a British 60k tonne carrier being manufactured...apart from these indigenous ones...
 
.
there is a rumor that India is discussing the purchase of a British 60k tonne carrier being manufactured...apart from these indigenous ones...

You Mean This :

The Observer, Sunday 15 November 2009

One of Britain's new £2bn aircraft carriers could be sold off under cost-cutting plans being considered by the Ministry of Defence. India has lodged a firm expression of interest, the Observer has learned.

The sale of one of the two 65,000-tonne vessels would leave the Royal Navy with a single carrier and could force Britain to borrow from the French fleet, which itself has only one carrier and is reluctant to build more. Last summer the French president, Nicolas Sarkozy, proposed to Gordon Brown that the two navies co-ordinate maintenance and refitting so that one was at sea at all times.

According to senior defence sources, Whitehall officials are examining the feasibility of a sale as part of the strategic defence review that will start early next year and is expected to result in savage cuts.

The carrier programme has already been delayed by two years to push back spending commitments, which itself will end up costing the taxpayer more in the long run. BAE Systems began work in July on HMS Queen Elizabeth, which is due to come into service in 2016. Preparatory work on the Prince of Wales, due for launch in 2018, has also started. The two carriers will replace the ageing Invincible class and are three times the size.

There were fears that the government could scrap one altogether. But it is understood that the financial penalties would be prohibitive. About 10,000 jobs in Portsmouth, Barrow-in-Furness, Fife and Glasgow depend on the orders.

http://www.guardian.co.uk/politics/2009/no...ay-sell-carrier

I Think India is NOT yet ready to go for super carriers.
First we need to have docks to handle these massive carriers.
 
.