In the mining industry the volume of waste rock above and between coal seams in an open-pit mine is commonly measured in bank cubic metres.
Removal of 7 cubic meters of rock does not appear to be much. I would say they have barely started. I am however astounded by the increase from $845-million to $7.7-billion? It is a nine fold increase! Why and how?
I am confused by this news. Neither the journalist nor the Chief Minister appear to know what they are really talking about.
Would anyone having inside connections with the SECMC please clarify a little so that idiots like me can understand what is the actual progress and why the need for nine fold increase from the original funding.
Sir, the more one examines the information being peddled, the more dubious it seems, but let them be happy. I can wait for the truth to be revealed, as it always is. $7.7 billion, and not a transmission line in sight.