Bharat_Bhakt
BANNED
- Joined
- Dec 4, 2015
- Messages
- 311
- Reaction score
- 0
- Country
- Location
Thing is corruption in purchase department of MOD and IAF which is the main reason for delay in LCA do you know all the parameters IAF has set for LCA are only avilable in some front line twin seater fighters of IAF like IFR and internal jammers and that LCA has more combat range better radar and BVR missiles and more hard points, weapon load capacity internal feul than the fighter it is to replaceIf the aircraft done it then no one is saying it can't be however, India has been claiming a lot about LCA so the claims cannot be rebutted until & unless the bird is finalized as per them. Rest the delays and a continue line of dates, is yet another story that no one can deny and success of JFT is already seen, can be saw and will be seen. Though no need to drag JFT or J-10 into it.