Not at all, rather it reiterates the fact that you are nothing more than a petty internet Troll, who don't even care to read the details of the article from the same link that you had provided. The CAG report was based on the tests done with the missiles delivered in way back in 2014. And this thread is all about a test conducted few days back. That clearly mean a period of well over 3 year for development. But yes, you are a Pakistani ?? I can understand. Not at all your fault.
If you still have doubts about our miraculous achievement do care to read the detailed report below.
http://www.livemint.com/Industry/Kr...issile-reported-30-failure-rate-says-CAG.html
Excerpt from above.
The CAG did not mention name of the strategic missile but sources said the auditor was referring to the Akash missiles. “
Out of 80 missiles received up to November 2014, 20 missiles were test fired during April-November 2014. Six of these missiles that is 30 per cent, failed the test,” the CAG said in the report. The auditor said as the failure rate of the sample tested was as high as 30%, action needs to be taken to establish the reliability of factory acceptance test of the remaining missiles.