PARIKRAMA
SENIOR MEMBER
- Joined
- Jan 5, 2014
- Messages
- 4,871
- Reaction score
- 185
- Country
- Location
Significant Project Milestones Of S-2/ARIHANT SSBN
Project Commencement Date: November 20, 1988
Commencement of Civil-Engineering Activities at Kalpakkam for Land-Based Nuclear Propulsion Plant (using a 83mWth pressurised water-cooled water-moderated reactor designed by Russia’s Afrikantov OKBM) also known as S-1, or ‘Half Boat’: 1989, with work being completed by 1999
Commencement of Metal-Cutting for S-2: January 5, 1998
Keel-Laying Ceremony Of S-2’s Hull: June 21, 1998 carrying the hull codename P-4102
Criticality Attainment of S-1: November 11, 2003. S-1 became fully operational on September 22, 2006
S-2’s Hull Launching Ceremony: July 26, 2009 at the Indian Navy-owned Shipbuilding Centre (SBC) at Visakhapatnam, with S-2 being christened as ARIHANT
Attainment of PWR Criticality on-board S-2/Arihant: August 10, 2013
Project Commencement Date: November 20, 1988
Commencement of Civil-Engineering Activities at Kalpakkam for Land-Based Nuclear Propulsion Plant (using a 83mWth pressurised water-cooled water-moderated reactor designed by Russia’s Afrikantov OKBM) also known as S-1, or ‘Half Boat’: 1989, with work being completed by 1999
Commencement of Metal-Cutting for S-2: January 5, 1998
Keel-Laying Ceremony Of S-2’s Hull: June 21, 1998 carrying the hull codename P-4102
Criticality Attainment of S-1: November 11, 2003. S-1 became fully operational on September 22, 2006
S-2’s Hull Launching Ceremony: July 26, 2009 at the Indian Navy-owned Shipbuilding Centre (SBC) at Visakhapatnam, with S-2 being christened as ARIHANT
Attainment of PWR Criticality on-board S-2/Arihant: August 10, 2013