Adani Power must be Producing Electricity by using Coal that is why the Cost would be that low because Coal Based Plants are still considered Lowest Cost Electricity Production. Solar is quite High and in efficient as developed Countriesdoesnt Paid much Attention towards it as most of them are in Colder Region with lots of Rain Falls thus low Sunlight.That is why I told you that it is a wrong priority. Do you know that we have a Power purchase agreement with Adani power and what is the cost? Less than 2.50 Rs per unit.