no lila ,
in reality we dont really have big naval enemy against us currently , our navy is probably stronger than any other force of ours .
we do need -a mrca contender which - can support navy too, but it cant be dedicated to navy itself.
for navy we have a good series of LCA coming in action as navy ordered some.
btw: today's news/
Indian Navy has okay-ed the placement of an order for six Naval Tejas Light Combat Aircrafts (N-LCA). At an approximate cost of Rs 150 crore per aircraft, this will provide a Rs 900 crore infusion into the Naval LCA programme.
That investment in the Tejas programme is rooted in the navy's plan to operate both light and medium fighters off its aircraft carriers.
The Naval LCA will supplement the heavier Russian MiG-29K, which has already been ordered from Russia. The Indigenous Aircraft Carrier (IAC), being built at Cochin Shipyard, Kochi, has been designed with a separate aircraft lift and maintenance facilities for the LCA, in addition to facilities for the MiG-29K. That has linked the development of the Naval LCA with the construction of the IAC, which is expected to join the fleet by 2014.
But the LCA programme faces a bottleneck in choosing a new engine. Two uprated engines -- the General Electric GE-414 and the Eurojet EJ-200 -- are currently being evaluated, but will be supplied only by 2013-14. And only with the new engine will the LCA have the power to get airborne from an aircraft carrier.
P S Subramaniam, the Director of the Aeronautical Development Agency, which coordinates the LCA programme, explains: "We will fly the Naval LCA with the current GE-404 engine to test its flight characteristics, and whether its structural strength is sufficient for aircraft carrier operations. After the LCA is fitted with a new, more powerful engine we will take the next step of operating from an aircraft carrier."
Meanwhile, a major shore-based test facility is coming up at INS Hansa, in Goa, which replicates an aircraft carrier deck on ground, complete with arrested recovery and a ski jump for take off. This facility, which is expected to be operational by October 2011, will be used for certifying the Naval LCA before actually flying off an aircraft carrier. This will also be used for pilots’ training and for training maintenance crews.
http://www.india-defence.com/reports/4480