SpArK

ELITE MEMBER
Joined
May 5, 2010
Messages
22,519
Reaction score
18
Country
India
Location
India
Engine Failure
:tsk:

Dream Project stutters to a stop,2000 crore and 20 years later

Two decades after venturing into an ambitious project to make an indigenous engine for our LCA, a project which was supposed to propel India into exclusive club of engine makers and meet domestic requirements with a 2000 crore rupees and 20 years of research , the engine project is abandoned for technical reasons.

However the Kaveri_snecma one with a projected 90kn thrust (+ reheat thrust) will be made and negotiations are still on.

What a shame!

DRDO is now saying it can power navy ships with modifications and can power LCA-Mk1 only.


Kaveri factfile

  • Lacks engine thrust reqd for LCA to perform its full envelope.
  • 2000 crores and 20 years.
  • Development effort reqd was underestimated at the time of sanction.
  • No database available for estimating realistic time and cost.
  • DRDO says its a major achievement in terms of technology demonstration.
 
.
Engine Failure
:tsk:

Dream Project stutters to a stop,2000 crore and 20 years later

Two decades after venturing into an ambitious project to make an indigenous engine for our LCA, a project which was supposed to propel India into exclusive club of engine makers and meet domestic requirements with a 2000 crore rupees and 20 years of research , the engine project is abandoned for technical reasons.

However the Kaveri_snecma one with a projected 90kn thrust (+ reheat thrust) will be made and negotiations are still on.

What a shame!

DRDO is now saying it can power navy ships with modifications and can power LCA-Mk1 only.


Kaveri factfile

  • Lacks engine thrust reqd for LCA to perform its full envelope.
  • 2000 crores and 20 years.
  • Development effort reqd was underestimated at the time of sanction.
  • No database available for estimating realistic time and cost.
  • DRDO says its a major achievement in terms of technology demonstration.

Well it was a bit too ambitious - but in the long run, can only benefit your country. God Speed.
 
.
it might be dead end for jet program but it still can be used for ships and railways...i think DRDO should think about that from now on.
 
.
That's due to the nexus of politicians and burocrates they are sold out to americans they are sabotaging our plans for Made in India stuff.

---------- Post added at 08:32 PM ---------- Previous post was at 08:31 PM ----------

Politicians and burocrates will not get bribe from DRDO and USA will loose big business worth billions that's why they have derailed, delayed and not destroyed the program.
 
.
can anyone provide information on whether it can be used for navy ships?
 
.
That's due to the nexus of politicians and burocrates they are sold out to americans they are sabotaging our plans for Made in India stuff.

Not only that the structure of GTRE was badly planned , infact worse than any government office.

The GTRE director was infact arrested at a massage parlour in Bangalore June 11...

Bangalore: DRDO scientist arrested in raid on massage parlour : South: India Today

Many such factors are responsible for the death of this ambitious project.

We can least hope atleast they speed up the so called negotiations on Kaveri Snecma...
 
.
can anyone provide information on whether it can be used for navy ships?

DRDO had some demonstrations given to Navy.But normal materials are to be replaced with corrosion resistant materials since they operate in marine environment. The question is whether the Navy has confidence in the engine.
 
. .
I,for one,shed no tears over it. Kaveri would have clipped future projects like the AMCA and the LCA MK-2 thereby unnecessarily jeopardizing them too.Sometimes it's better to cut your losses and walk away rather than bet your house on it.
 
.
DRDO had some demonstrations given to Navy.But normal materials are to be replaced with corrosion resistant materials since they operate in marine environment. The question is whether the Navy has confidence in the engine.

i meant whether it is powerful enough for navy ships?
 
.
i meant whether it is powerful enough for navy ships?

Typically warships run on regular diesel engines; gas turbines (such as the Kaveri) are added on to provide “boost power”, needed for manoeuvring in battle. Contemporary gas turbines, such as the General Electric LM2500, provide India’s latest 5000-tonne Shivalik class frigates with 22 MW of boost. The Kaveri’s more modest 12 MW is sufficient only for smaller warships.

---------- Post added at 09:50 PM ---------- Previous post was at 09:48 PM ----------

An old report



September 08, 2009

Navy snaps up Kaveri engine built for Air Force


The indigenous Kaveri aircraft engine, soon to make its debut flight, lacks the muscle needed by India's [ Images ] Tejas light combat aircraft, which the engine was designed to power. In its present form, the Kaveri will never power a modern fighter.


But the engine's technology -- developed by the Defence Research and Development Organisation, over two decades, at a cost of Rs 3000 crore -- will not be wasted. The Indian Navy is snapping up the Kaveri for powering its growing fleet of warships.

The Navy has officially informed the Gas Turbine and Research Establishment (the DRDO laboratory that developed the Kaveri) that naval warships will need 40 Kaveri Marine Gas Turbines over the next 15 years.

In an important signal of its support, the Navy has agreed to fund 25 per cent of the cost of the KMGT project.

GTRE has developed the marine Kaveri by modifying the aero engine with a shaft, through which power can be delivered to a propeller. The Navy has extensively tested these engines at Vishakhapatnam and found that the marine Kaveri can deliver 12 Megawatts (16,000 Horsepower) of propulsion power.

Typically warships run on regular diesel engines; gas turbines (such as the Kaveri) are added on to provide 'boost power', needed for manoeuvring in battle. Contemporary gas turbines, such as the General Electric LM2500, provide India's latest 5000-tonne Shivalik class frigates with 22 MW of boost. The Kaveri's more modest 12 MW is sufficient only for smaller warships.


While the marine Kaveri's basic performance has been established (even Prime Minister Manmohan Singh has seen a demonstration in Visakhapatnam [ Images ]), the GTRE Director, Dr Mohana Rao, is not yet satisfied with the basic design.

"So far, the KMGT is just a spin-off from the aero version," said Rao. "I want to give the Navy an engine with far greater endurance. An aero engine's life is just 3000 hours; a marine engine's life should be 30,000 hours. I must physically test the KMGT for at least 15,000 hours."

GTRE is going ahead with developing 3-4 test engines and beginning trials within three years. The trials will be conducted in a marine environment, which will include high humidity, and prolonged exposure to salt.

"We plan to begin delivery in about 6 years", says the GTRE director, "We hope to keep the cost below Rs 25-30 crores, which is considerably cheaper than buying imported gas turbines."

Earlier this year, the United States State Department had stopped General Electric from fitting its LM-2500 turbines on the INS Shivalik, apparently because GE had not obtained proper permissions from the US government.

Other than the 40 KMGTs, the Indian Navy has also issued a letter laying out a requirement for 42 Gas Turbine Generators, or GTGs. These are de-rated versions of the marine Kaveri, which will be used for generating electrical power on warships. Each GTG generates 1.2 Megawatts of power.


The Indian Navy, an enthusiastic proponent of indigenisation, proposes to replace the diesel generators fitted on older warships with the Kaveri GTG. If it performs well over a period of time, the new-generation warships will also get electrical power from the Kaveri GTG. Currently, only the Rajput and Delhi [ Images ] class of destroyers use gas turbines for power generation.
 
. .
Soon this thread will be infested with trolls ! I see a long life for this thread !!!!
 
.
Spark what is your source? My source says kaveri project still on :agree:
 
. .
Back