Karachi to Kotri - The first railways in Pakistan
By Owais Mughal.

The first railway line was laid in the in the areas that now comprise Pakistan in the year 1858 in Karachi. The following is the story of this historical event as well as the construction of first railway section of Pakistan which was opened between Karachi City and Kotri in 1861.

The following photo is kind of jumping the gun in our story but it is the earliest photo of railways that I could research for Karachi-Kotri section. The photo is circa 1900 and shows the 5:30am passenger train reaching Frere Road Station (now called Karachi Cantonment) from Kotri.


0530 Passenger arriving at Karachi from Kotri, 1900

The origin of Railways in Pakistan is quite unusual. The railway here was not built for commercial passenger service but more for the reason of cutting transport time for cargo bound for East. The first line from Karachi to Kotri was constructed primarily to reduce the journey time on the final stage of long haul from Britain to Delhi and Calcutta. Many of the later lines were built for Military purposes.

The Early Planning
The Railway planning in the areas that comprise Pakistan got an official status when Lord Dalhousie, Governer General of India, gave his approval for laying a 108 miles (173km) long railway line between Karachi and Kotri in December, 1853 .

Scinde Railway (SR) Company
The next significant event in the history of Karachi-Kotri section occured in 1855 when Scinde Railway Company was formed in London. In January 1856, a contract was signed between East India Company and Scinde Railway Company to build Karachi-Kotri Railway Line. In 1857, Scinde Railway Company's scope was increased to laying a railway track between Karachi and Kotri and also between Multan and Amritsar via Lahore.

Ground Breaking of the First Railway Project
Sir Bartle Frere, who was the then Commissioner of Scinde (Sindh) did the ground breaking of the project on April 29, 1858. The ceremony included him pushing a wheel-barrow full of construction material at the site of a railway embankment in Karachi.

I can say for sure that first Railway Track in Pakistan was thus laid somewhere between April, 1858 and December, 1859. This is a 16 month long time period but I am unable to research the exact date or a time window any shorter than this.

In 1859, two small stretches of Railway Line were opened in Karachi. One of this track section still exists while the other one has been uprooted.

The First Operational Railway Track
The First section, which exists to date, ran from the then Karachi port of Kimari to Railway Workshops which were located near the present daykala pul just north of Karachi Cantonment Station.

See the map of Karachi from 1893. Find Kimari here which was an island in 1893. From Kimari follow the solid black line towards the 'green rectangle' (now Karachi Cantonment Station) and onwards to violet rectangle (which was once the Railway Workshop). The precise location of this Railway Workshop, which is not present today is unknown to me. There are two routes shown between Kimari and Karachi Cantonment. I will request you to consider the lower one, the one which bypasses the blue rectangle. This was the first ever piece of railway track built in Karachi (and Pakistan).


Map of Karachi area, 1893

The Second Operational Railway Track
The Second Track which became operational in Karachi started from the Railways Workshop near present-day 'kala pul' and went east-wards to Gizri bandar (harbor) located in Gizri Creek. This track and the Railway Workshop is not present anymore but my strong guess is the track ran parallel to present-day Korangi Road until it reached Gizri Creek (near Present Day Marina Club in Defense Housing Society). Any confirmation here from our learned readers will be highly appreciated.

This following map shows the location of these very first stretches of Railway Lines which were built in Pakistan. Note the location of present day Kimari, Karachi City Station, Karachi Cantonment Station and Ghizree (Gizri) Creek marked on the map. Also note how the English spellings of these places have evolved over time.


Early railway lines in the Karachi area
(Click for a larger view.)
The following is the satellite image of present day Karachi with superimposed colored lines to show the two sections which became operational in 1859. While the 'green' track is still operational, the history that I have researched so far is silent on when was the 'yellow' track uprooted and what was its exact route.


Satellite map showing Karachi area railway lines in 1859

When Karachites saw the First Railway Locomotive
Of the whole of what is now Pakistan, people of Karachi were the first to see a steam locomotive in action and many could not believe what were they seeing.


Diagram of 0-6-0 Scindhia class locomotive
(Click for a larger view.)
The locomotive diagram shown above is of a 0-6-0 Scindhia Class which was among the first few used on railways in present day Pakistan

As an inaugural run of Railways in Karachi, John Brunton the Chief Engineer of Karachi-Kotri Railway Project, drove in a steam locomotive with Sir Bartle Frere, the Commissioner of Sindh to Kiamari in a railway train. Once again I don't have the exact date of this travel but it was most likely between 1859 and 1861.

John Brunton wrote the following anecdote on this occasion and it sounds so strange today:

The natives of Scinde had never seen a locomotive engine, they had heard of them as dragging great loads on the lines by some hidden power they could not understand, therefore they feared them, supposing that they moved by some diabolical agency, they called them shaitan. When I got out my locomotive for trial the Karachi natives were astounded. I drove the engine myself of course at a slow speed - the natives thronging all round, I was fearful of some accident. At last I thought I should frighten them away, so I blew the engine steam whistle loudly. Instantly they all rushed back from the "Demon" falling over one another much to our amusement.

This completes our capturing of the history of first railway tracks in the city limits of Karachi (and Pakistan). Now let us review the history of Railways North-eastwards of Karachi to Kotri.

Indus Flotilla Company
We promise a detailed post on Indus Flotilla Company soon. Today we'll just give a brief introduction about it.

Before the advent of Railways, cargo from Karachi harbor was shipped to rest of India via steamers of 'Indus Flotilla Company'. The steamers took Cargo upto Multan via river Indus and Chenab. This river journey between Karachi and Multan used to take up to 40 days.

Therefore one of the purposes of building Karachi-Kotri railways was to reduce travel times of Indus Flotilla Company. Once Karachi-Kotri railway was completed, Indus Flotilla Company steamers could take cargo from Kotri instead of Karachi and it saved them approx 250km of circuitous journey through Indus River delta.

Look at the map below. It is from 1865 when Karachi-Kotri and Multan-Lahore-Amritsar Railway line was already built. The reason I want to share this map here is to show how the cargo was moved from Karachi to Delhi via rail and river.


Indus Flotilla Company map, 1865
(Click for a larger view.)
Gauge Selection for Karachi-Kotri Railway Line
The guage (width) of the railway line was selected as 5'6". It however, narrowly escaped conversion to meter gauge due to high cost of the project.

The reason why the decision was finally made in favor of wider gauge for Karachi-Kotri section was the fact that strong sea breeze blows in this area during monsoon. As there is no natural hindrance, the winds blow with such speed that they pose immense resistance to smaller vehicles. One needs to travel on this route during monsoon to actually feel how strong the winds can be. It has been recorded that strong sea breeze blows on this section on 330 days out of 365 days of a year.

Challenges Faced During the Construction
As the construction on Karachi - Kotri section began, the engineers had to face extreme problems which do not exist today. There were no motor trucks, cars or trolleys in those days. Boats and bullock carts had to be used for the transport of rails.

Whenever the chief engineer wanted to go on inspections, a whole congregation had to go with him including men, tents and camels. The average distance they could cover was no more than 15km a day. Little confidence was reposed in the local people and the British officers moved about armed. The chief engineer John Brunton always carried a brace of loaded revolvers in his belt and a sword by his side.

The contractor, by the name of Brav, got in a lot of trouble. He ran away after 12 months leaving 12,000 workmen unpaid.

Climatic Challenges
The Karachi-Kotri line had to cross numerous water courses which were normally dry, but became raging ******** in the rainy season. Malir river is a good example that floods and cause havocs every few years to this date. To cut the cost, the engineers did not bridge these water courses and instead laid the railway line on stone filling across the bed of streams. They thought that embankments could be flooded without permanent damage. But the water flow was rapid and the stone dressing was washed away and had to be replaced by bridges.

The climatic features here are quite unique. The average rainfall in this area is approximately 180 mm per year but 90mm of it can fall within a day, therefore flash floods are very common here.

Bridges on Karachi-Kotri Section
Thirty two bridges were built on this section to cope with the high rate of flash floods. 25 of these bridges are masonry arched bridges with spans of between 20 feet and 45 feet.

The longest bridge on Karachi-Kotri section is a viaduct of thirty two 45-foot arches across the Bahrun River. Construction on this bridge was started on 5 March 1859 and completed on 26 January 1861.

Another major bridge on this section is the bridge over Malir River which connects Malir and Landhi localities of Karachi.

Locally quarried limestone is used in the masonry of bridges and station buildings on this section.

Cost of Karachi Kotri Railway Section in 1861
All the problems listed above kept raising the cost of Karachi - Kotri railway line and when the project was complete the cost of this railway line came out to Rupees 250,000 per mile. Imagine this cost 148 years ago!

The Inauguration Date
The project was finally completed in 3 years and the 173km long Karachi-Kotri section was opened for rail traffic on May 13, 1861.

Salient Features
Today, the Karachi-Kotri portion of railway line is still one of the fastest speed track in Pakistan with passenger train speeds reaching 120km/h. This portion of railway line also holds the distinction of having the biggest railway yard in Pakistan with 80 railway tracks running parallel to each other near Pakistan Steel Mills. The gradient on some portion of the Karachi-Kotri track is 1 in 200 feet. The curves are no sharper than 43 chains radius.

The Original Fencing of Track - It still exists after 148 Years!
The Railway track for its entire length was fenced or walled on both sides and the locomotives were not equipped with cow-catchers. The amazing thing is the portions of this wall built 148 years ago can still be seen on both sides of the track between Karachi and Kotri. Of course at many places it is completely gone but at several places it is pretty intact in the form of limestone wall which is now just couple of feet or less high from the ground.

First Locomotives Used on Karachi-Kotri Section
The first locomotives to be used in and around Karachi and on Karachi-Kotri route were four 2-4-0 tender engines made by Kitson and Co of Leeds in 1858. They had inside cylinders of dimensions 16" x 24" and coupled wheels of 5' 1-1/2".

Seven locomotives which were 2-2-2 'singles' with cylinder dimensions of 15" x 22" and 6-foot driving wheels were supplied by Sharp Stewart & Co in 1859.

In the same year (1859) Sharp Stewart & Co also supplied thirteen more locomotives which were 0-6-0 Goods engines with cylinder dimensions of 16" x 24" and 5-foot coupled wheels.

These engines burned coal. In addition to Karachi and Kotri, water was taken by these engines at Jungshahi (km 91) and Jhimpir (km 124).

Karachi - Kotri Railway Map - 1861
The following is the map of Karachi-Kotri track as it opened for rail traffic in 1861. This is a very interesting map. Please take a moment to appreciate the details on this map. Note the 'dotted' hill road shown between Karachi and Kotri is the same alignment as used by the Karachi-Jamshoro Super Highway and future's Motorway M9.

The dotted line shown as lower road to Jeeruk (now called Jhirk) is the present day alignment of the Karachi-Torkham N5 highway. Also note the location of present day Manghopir given as Mugger Pir.

Note the spellings of names of various places which are now pronounced a bit differently.

Please click on the map below and see a larger and better readable image.


The Building of Karachi Cantonment Station
Karachi cantonment station when built was called Frere Road Station and served the elite' residential areas of Karachi. Frere road that used to connect Cantonment Station to saddar is nowadays called 'Dr Daud Pota' road. The present building of Karachi Cantonment station was completed in 1898 and currently it has been declared a 'Protected Heritage' by the Government of Sindh.


Karachi Cantonment station, 1900


Karachi Cantonment station, 1910
 
Karachi Cantonment Station in 1930




Railway Stations on the Karachi-Kotri Route

  • Kimari: 0km point on Pakistan's Main Line that runs from Karachi to Peshawar.
  • Karachi City: 5km
  • D.C.O.S (Halt): 7km
  • Karachi Cantonment: 9km
  • Chanesar Goth (Halt): xx
  • Departure Yard: xx
  • Karsaz (Halt): xx - station now closed
  • Air Force (Halt): xx - station now closed
  • Drigh Road Jn: 19km - Junction for Karachi Circular Railway loop
  • Drigh Colony Jn: 21km - Junction for Karachi Circular Railway Loop
  • Malir Colony Jn: 24km - Junction for Malir Cantonment via Matapan & Model Colony
  • Airport (Halt): 25km
  • Malir: 26km
  • Landhi Jn: 29km - junction for Karachi Circular Railway line to Korangi
  • Jumma Goth: 35km
  • Bin Qasim: 43km (previously called Pipri)
  • Badal Nala: xx
  • Marshalling Yard Pipri: xx
  • Gaddar: xx
  • Dabheji: 61km (Last Station of Karachi City Limits)
  • Ran Pethani: 79km
  • Jung Shahi: 91km
  • Braudabad: 108km
  • Jhimpir: 124km
  • Meting: 143km
  • Bholari: 164km
  • Kotri Jn: 174km
 
Awesome, all the stations looks such an vintage art :)
One more reason to visit pakistan, i wish they allowed visa for lonely traveler :(
 
Awesome, all the stations looks such an vintage art :)
One more reason to visit pakistan, i wish they allowed visa for lonely traveler :(

Honestly i don't think it's safe to travel to pakistan at current situation and should not take the risk.
 

Pakistan Affairs Latest Posts

Back
Top Bottom