F.O.X
PDF THINK TANK: ANALYST
- Joined
- Dec 18, 2006
- Messages
- 3,526
- Reaction score
- 6
- Country
- Location
not happening ..
not because KPK cant do that , but power in Pakistan is controlled by National grid is Isb , any power installed is Added to the Grid & then distributed from there , So if KPK even managed to produce 5000MW in next 5 years it will drastically reduce load shedding , whose current deficiency is 6000MW .
And the Whole credit of Ending Load Shedding will be taken by PMLN ... that is also the reason SS did nothing in Punjab is past 5 years even though he not only had the resources but also the capability to do so.
in KPK , PTi will focus on Better Living standard , More Jobs , Industry , Education , & Police .
And Central will be left to deal with power crisis.
not because KPK cant do that , but power in Pakistan is controlled by National grid is Isb , any power installed is Added to the Grid & then distributed from there , So if KPK even managed to produce 5000MW in next 5 years it will drastically reduce load shedding , whose current deficiency is 6000MW .
And the Whole credit of Ending Load Shedding will be taken by PMLN ... that is also the reason SS did nothing in Punjab is past 5 years even though he not only had the resources but also the capability to do so.
in KPK , PTi will focus on Better Living standard , More Jobs , Industry , Education , & Police .
And Central will be left to deal with power crisis.