What's new

PSLV-C30 / ASTROSAT Mission - India set to become World's Fourth to Launch a Space Observatory

Chanakya's_Chant

SENIOR MEMBER
Joined
Jul 22, 2013
Messages
3,395
Reaction score
28
Country
India
Location
India
Launch on September 28 at 10 AM
1.PNG
2.PNG
3.PNG
4.PNG
5.PNG
6.PNG
7.PNG
8.PNG
 
Last edited:
.
tilted-view-of-astrosat-with-folded-solar-arrays-wrapped-protective-covering.jpg

A TILTED VIEW OF ASTROSAT WITH FOLDED SOLAR ARRAYS WRAPPED IN A PROTECTIVE COVERING

astrosat-3d-view.jpg

ASTROSAT 3D VIEW

astrosat-during-pre-launch-test-clean-room.jpg

ASTROSAT DURING A PRE-LAUNCH TEST IN A CLEAN ROOM

astrosat-clean-room-before-its-integration-with-pslv-c30.jpg

ASTROSAT IN CLEAN ROOM BEFORE ITS INTEGRATION WITH PSLV-C30

astrosat-clean-room-pre-launch-test.jpg

ASTROSAT IN CLEAN ROOM FOR A PRE-LAUNCH TEST

spacecraft-stowed4-tilted.jpg

ASTROSAT IN TILTED POSITION IN CLEAN ROOM FOR A PRE-LAUNCH TEST

dsc0203.jpg

ASTROSAT

fueling-of-astrosat-satellite-preparation-facility-satish-dhawan-space-centre-shar.jpg

FUELING OF ASTROSAT IN SATELLITE PREPARATION FACILITY AT SATISH DHAWAN SPACE CENTRE SHAR
 
.
fully-integrated-pslv-c30-core-stage-with-strap-ons-mobile-service-tower.jpg

FULLY INTEGRATED PSLV-C30 CORE STAGE WITH STRAP-ONS AT MOBILE SERVICE TOWER

hoisting-of-pslv-c30-second-stage-during-vehicle-integration.jpg

HOISTING OF PSLV-C30 SECOND STAGE DURING VEHICLE INTEGRATION

inspection-of-astrosat-clean-room-prior-to-its-launch.jpg

INSPECTION OF ASTROSAT IN CLEAN ROOM PRIOR TO ITS LAUNCH

integration-of-astrosat-progress-clean-room-isro-satellite-centre.jpg

INTEGRATION OF ASTROSAT IN PROGRESS IN A CLEAN ROOM AT ISRO SATELLITE CENTRE

integration-of-strap-ons-to-pslv-c30-core-stage-under-progress.jpg

INTEGRATION OF STRAP-ONS TO PSLV-C30 CORE STAGE UNDER PROGRESS

mobile-service-tower-containing-pslv-c30-integrated-upto-second-stage.jpg

MOBILE SERVICE TOWER CONTAINING PSLV-C30 INTEGRATED UPTO THE SECOND STAGE

partial-view-of-astrosat-clean-room-with-its-solar-arrays-deployed-condition.jpg

PARTIAL VIEW OF ASTROSAT IN CLEAN ROOM WITH ITS SOLAR ARRAYS IN DEPLOYED CONDITION

pslv-c30-first-stage-nozzle-end-segment-being-placed-launch-pedestal.jpg

PSLV-C30 FIRST STAGE NOZZLE END SEGMENT BEING PLACED ON LAUNCH PEDESTAL
 
.
These satellites also will be launched on PSLV-C30
23px-Flag_of_Indonesia.svg.png
LAPAN-A2 (Indonesia)
23px-Flag_of_Canada.svg.png
ExactView 9 (Canada)
23px-Flag_of_the_United_States.svg.png
Lemur 2 (USA)
23px-Flag_of_the_United_States.svg.png
Lemur 3
23px-Flag_of_the_United_States.svg.png
Lemur 4
23px-Flag_of_the_United_States.svg.png
Lemur 5
 
Last edited:
. .
PSLV-C30 / ASTROSAT MISSION UPDATE: Mission Readiness Review (MRR) committee and Launch Authorisation Board (LAB) have cleared the 50 hr countdown starting at 08:00hr IST on Saturday, September 26, 2015 and the launch of PSLV-C30/ASTROSAT Mission for MONDAY, September 28, 2015 at 10:00 hr IST

PSLV-C30 / ASTROSAT MISSION UPDATE: The 50 hr countdown activity of PSLV-C30/ASTROSAT Mission has started at 08:00 hr IST today, Saturday, September 26, 2015

PSLV-C30 / ASTROSAT MISSION UPDATE: Mono Methyl Hydrazine (MMH) propellant filling operation of fourth stage (PS4) of PSLV-C30 is under progress

PSLV-C30 / ASTROSAT MISSION UPDATE: MMH propellant filling operation has been completed by 12:00 hr IST. Preparations for Mixed Oxides of Nitrogen (MON-3) oxidiser filling operation of PS4 are under progress

PSLV-C30 / ASTROSAT MISSION UPDATE: MON-3, oxidiser filling operation of Fourth Stage (PS4) has been completed by 16:15 hr IST

PSLV-C30 / ASTROSAT MISSION UPDATE: Countdown activities are progressing normally.
 
.
Every other day ISRO is launching a new satellite, damn they are making it look like a everyday business now. Congrats ISRO.
 
. . . .

Pakistan Defence Latest Posts

Pakistan Affairs Latest Posts

Back
Top Bottom