What's new

PML-N Political Desk

@hasnain0099

10_08.gif
 
Last edited by a moderator:
.
The above article reiterates my point, the APC was cancelled because PML was ill-prepared, and not because of Imran Khan.
@hasnain0099, @cb4, @Tiger Awan and all other Nooners, ab to yaqeen aya?
 
Last edited by a moderator:
.
Saleem sahib has his point of view and I appreciate that, actually the clutter of leadership is pretty dense. I can still remember Siddique Al Farooq sahib not being awarded any ministry or advisorship. We must remember that PML-N has 138 seats in the parliament. However, only 20 odd ministries and advisorships are present. If going by Saleem sahib's logic, Siddique Al Farooq,Pir Sabir Shah sahib and Ghaus Ali Shah sahib deserve president-ship more than Mamnoon sahib. However, even the appointment of somebody neutral like Sirtaj Aziz sahib would result in raising voices against him (due to lack of memory of our national clutter). So N has tried to adopt a balanced approach by appointing an urdu speaking businessman.
Regarding Governorship, Saleem sahib while points out the change of governorship, however, we must understand that governor KPK has not resigned. Only two governors (i.e. Baluchistan and Punjab) have resigned til now and resultantly have been changed.even the KPK government hasn't flagged any working issue with Governor KPK. If they have any, they should approach federation with demand for removing governor KPK.
 
Last edited by a moderator:
. . .
Govt to spend Rs930mn on mineral, ores exploration

LAHORE: The Punjab government will spend Rs830 million on exploration of mineral and ores mines during current fiscal.

Official sources told APP on Thursday that Pakistan had huge deposits of minerals and and ores but lacked of modern technology. Last year, they said, government had undertaken some ten schemes in mineral and ore sector but there was little development towards this end.

During current fiscal, sources said, it intended to accomplish mining estates in Mianwali, Dera Ghazi Khan, Khushak and Chakwal while feasibility of iron mines in Chiniot and Dera Ghazi Khan was on cards.

The government is also carrying out a study to assess coal reserves in Photohar region.

According to initial estimates, there are vast coal reserves in the area and government would start three mega projects to produce power from coal.

Govt to spend Rs930mn on mineral, ores exploration
 
.

اس پر سادہ سی رائے ہے کہ سپریم کورٹ کو سننا چاہئے تھا پیپلز پارٹی کو بھی اور تحریک انصاف کو بھی، اور سنے بغیر انہوں نے فیصلہ دیا جس کو indecent haste کہا جا سکتا ہے اس کا کوئی جواز نہیں تھا ایک آدھ دن موخر کر دیتے اور یہ بات بھی کہ سپریم کورٹ کا پیپلز پارٹی کے ساتھ ایک رویہ اور ن لیگ کے ساتھ دوسرا رویہ ہے وہ نندی پور کا معاملہ وہ مہنگی گیس خریدنے کا معاملہ ہو یا ہائبرائڈ کاریں خریدنے کا معاملہ ہو، اب تو کوئی سو موٹو نوٹس نہیں لیا

کیا اب اس طرح کی کرپشن نہیں ہو رہی یہ جوبارہ سو سی سی کی ہائبرائڈ کاروں کی بکنگ نہیں ہوئی یہ نندی پر پراجیکٹ کی قیمت 35ارب روپے کیسے بڑھ گئی اور جو ملک ریاض کو ایک سو انیس ارب کا نوٹس جاری ہوا ہے اس پر پیش رفت کیوں نہیں ہو رہی



Haroon ur Rasheed in On The Front (Dunya TV)
 
.

Get ready for Eid gift from Govt, increase in patrol price coming right before the Eid, with love.. :lol:
 
Last edited by a moderator:
.
Combined waste treatment plant to be built at Hadiara

LAHORE:

The Punjab government is planning to establish a combined waste treatment plant at Hadiara Drain to treat effluent from some 825 industrial units and residential areas along the drain, The Express Tribune has learnt.

The plant will cost over Rs2 billion, cover some 35 acres and be able to treat 1,200 to 1,500 cusecs, an official requesting told The Express Tribune on the condition of anonymity.

The chief minister has set up a committee headed by the finance secretary to look at the feasibility of the plant, he said.

The committee met and proposed that the methodologies adopted at the Korangi industrial area and at the Kasur tannery zone be examined to make the new proposal more practical.

The drain was built before Partition and originates in Amritsar.

It runs for 45 kilometres in India and enters Pakistan southeast of Lahore, running for some 55km before joining the Ravi near Mohlanwal.

Some 825 industrial units including paper mills, hosiery units, tanneries and chemical factories discharge their effluents directly and indirectly into the drain. Only 27 units have wastewater treatment plants.

The inhabitants of nearby areas use water from the drain to irrigate their crops.

Their animals drink the water and bathe in the drain, causing stillbirths and diseases of the skin, alimentary canal and digestive system.

The provincial government will also plant trees and construct paved roads on both sides of the drain, remove encroachments and ban the use of drain water to irrigate vegetables in the area, said the official.

Farmers will be provided canal water for irrigation and for their animals, he added

Industrial pollution: Combined waste treatment plant to be built at Hadiara – The Express Tribune
 
. . .
Combined waste treatment plant to be built at Hadiara

LAHORE:

The Punjab government is planning to establish a combined waste treatment plant at Hadiara Drain to treat effluent from some 825 industrial units and residential areas along the drain, The Express Tribune has learnt.

The plant will cost over Rs2 billion, cover some 35 acres and be able to treat 1,200 to 1,500 cusecs, an official requesting told The Express Tribune on the condition of anonymity.

The chief minister has set up a committee headed by the finance secretary to look at the feasibility of the plant, he said.

The committee met and proposed that the methodologies adopted at the Korangi industrial area and at the Kasur tannery zone be examined to make the new proposal more practical.

The drain was built before Partition and originates in Amritsar.

It runs for 45 kilometres in India and enters Pakistan southeast of Lahore, running for some 55km before joining the Ravi near Mohlanwal.

Some 825 industrial units including paper mills, hosiery units, tanneries and chemical factories discharge their effluents directly and indirectly into the drain. Only 27 units have wastewater treatment plants.

The inhabitants of nearby areas use water from the drain to irrigate their crops.

Their animals drink the water and bathe in the drain, causing stillbirths and diseases of the skin, alimentary canal and digestive system.

The provincial government will also plant trees and construct paved roads on both sides of the drain, remove encroachments and ban the use of drain water to irrigate vegetables in the area, said the official.

Farmers will be provided canal water for irrigation and for their animals, he added

Industrial pollution: Combined waste treatment plant to be built at Hadiara – The Express Tribune

cb4 sorry but dont u think PMLN is focusing too much only on solid waste management projects afta elections haha i see you posting news on this only

@Leader @Jazzbot
 
Last edited by a moderator:
.
again its the same tactic used in the mobile tax, but its going to hit hard on poor.... aik wari fair pukha shair... :lol:

Its just one month since budget and we have what? Increase in price of petrol twice, increase in electricity price.. Fiscal budget is just s show piece..
 
.
Its just one month since budget and we have what? Increase in price of petrol twice, increase in electricity price.. Fiscal budget is just s show piece..

Yar, look at dollar exchange rate> 105. expect it to hit 110 this year. and by the end of 3 years 130 Rs, this is a guarantee for inflation. agay life is going to be tough for ordinary people !!
 
. .

Pakistan Affairs Latest Posts

Back
Top Bottom