What's new

Peshawar Metro Bus

It was shuja pasha. No confusion about it.
You are one dumb guy...arent ya?
https://defence.pk/pdf/threads/gene...e-raheel-and-then-army-will-take-over.389254/

https://www.thenews.com.pk/print/13...mation-about-former-isi-chiefs-role-in-dharna

Then it was left to the loudmouth defence minister to reveal the plot and name the ‘conspirators’. They were the ISI boys — first retired Gen Shuja Pasha was alleged to have helped Imran Khan build his party, then retired Gen Zaheerul Islam was the mastermind behind the long march and ‘dharna politics’.


pmln and ppp will be eliminated, pti will form majority and change the system to a presidential one, u and i will both be here ia, we will revisit this post after 2018 elecs.
U are saying this only because you support PTI...

we will revisit this post after 2018 elecs

Sure
 
.
You are one dumb guy...arent ya?
https://defence.pk/pdf/threads/gene...e-raheel-and-then-army-will-take-over.389254/

https://www.thenews.com.pk/print/13...mation-about-former-isi-chiefs-role-in-dharna

Then it was left to the loudmouth defence minister to reveal the plot and name the ‘conspirators’. They were the ISI boys — first retired Gen Shuja Pasha was alleged to have helped Imran Khan build his party, then retired Gen Zaheerul Islam was the mastermind behind the long march and ‘dharna politics’.



U are saying this only because you support PTI...

we will revisit this post after 2018 elecs

Sure
I never base my analysis on personal wishes.:-)
 
.
You are one dumb guy...arent ya?
https://defence.pk/pdf/threads/gene...e-raheel-and-then-army-will-take-over.389254/

https://www.thenews.com.pk/print/13...mation-about-former-isi-chiefs-role-in-dharna

Then it was left to the loudmouth defence minister to reveal the plot and name the ‘conspirators’. They were the ISI boys — first retired Gen Shuja Pasha was alleged to have helped Imran Khan build his party, then retired Gen Zaheerul Islam was the mastermind behind the long march and ‘dharna politics’.



U are saying this only because you support PTI...

we will revisit this post after 2018 elecs

Sure

This post came from your behind didn't it.

http://www.pakistaniscandals.com/post/3621/links-between-pti-and-lt-gen-retd-shuja-pasha-conf.html

http://new-pakistan.com/2011/11/23/why-is-a-pti-establishment-link-so-easy-to-believe/

https://tribune.com.pk/story/295690/pti-faces-fresh-allegations-of-establishment-links/

http://www.telegraph.co.uk/news/wor...ehind-Imran-Khans-revolt-claims-minister.html
 
.
He retired in 2012...U are confusing him with Gen Zaheer ul islam


PTI will never make fed gov in the next election...Its not just PMLN being eliminated..they are only the first ones..sbki bari ay gi.

Maybe you are right, I would love to see PTI come in power, but the system is too corrupt I wouldn't hold my breath.
 
.
Only one aim on mind... BRT Corridor completion on time. Lean concrete started on underpass at Aman Chowk.


25289269_940316342798773_5710766361267501919_n.jpg




24993386_940316369465437_6374688386592935367_n.jpg




25152322_940316432798764_384206363515858750_n.jpg




Box bed of underpass 5 at Phase 5 Hayatabad ready for concrete, pump machine arrived.


25289704_940332239463850_877452121826302728_n.jpg




Just in: Fresh lean concrete covered with plastic sheet at Aman chowk due to rain.


24993466_940384669458607_8224262205878831888_n.jpg

_
 
. .
#PESHAWARBRT Update: Concrete in bed of underpass 4 on University Road completed.


25289424_942453712585036_2107352495746579188_n.jpg

25353972_942453732585034_3055930230056514119_n.jpg

25396002_942453762585031_8286992406865216100_n.jpg

25299450_942453802585027_7065750165740454513_n.jpg


Work in progress 24/7 throughout the BRT Corridor.


25299215_942682849228789_2934245111516323905_n.jpg

25289193_942682879228786_3812305458739625016_n.jpg

25299375_942682915895449_4313825761995766093_n.jpg

25299347_942682942562113_7609120786551509581_n.jpg

25348728_942682969228777_1133804804441449471_n.jpg
25348450_942682999228774_5203145593251762653_n.jpg

25348281_942683039228770_5580661225345961028_n.jpg

__________________

BRT Corridor Reach 1 .. latest pictures.


24176843_942697582560649_4651948528085601809_n.jpg

25353802_942697609227313_6734062676458373719_n.jpg

25353772_942697659227308_5658090015897042966_n.jpg

25289289_942697685893972_5967026820884114730_n.jpg

25348469_942697705893970_4141522626129530411_n.jpg

25442753_942697719227302_4187823857912263089_n.jpg
 
.
Latest pictures of Reach 2.


25399189_942698219227252_9072360610123347388_n.jpg

25299146_942698232560584_4179277648274709238_n.jpg

25289299_942698249227249_3674285437708920005_n.jpg

25289539_942698299227244_5333638882100297841_n.jpg

25353867_942698329227241_2250155219217169967_n.jpg

25299040_942698352560572_5665086004467463040_n.jpg


#PESHAWARBRT Update: Aggregate base 1st layer near PDA Building Phase 5 Road Hayatabad.


25398931_942996625864078_3415749287807580754_n.jpg

25395990_942996649197409_9116267312140543778_n.jpg


#PESHAWARBRT Update: Steel work in full swing on retaining wall and track of area around and after underpass 03 near Chamber of Commerce & Industry on Reach 1 of BRT Corridor.


25298970_943017239195350_9172204976649062327_n.jpg

25289691_943017262528681_8991131039365825390_n.jpg

25289691_943017262528681_8991131039365825390_n.jpg

25353771_943017299195344_6549394253437370704_n.jpg

25398612_943017325862008_7652214054921895900_n.jpg

25348391_943017355862005_3548313428111939846_n.jpg

25399100_943017379195336_6840132557176926824_n.jpg

25299241_943017409195333_151316955605204263_n.jpg

25348268_943017455861995_2370635119235424760_n.jpg

25446303_943017475861993_5842768064229958239_n.jpg

25348344_943017515861989_2286085512020919409_n.jpg
 
.
#PESHAWARBRT Update: Various bores in progress at Shoba bazar, Sunehri Masjid road & Sir Syed road on Reach 2 of BRT Corridor.


25299437_943248429172231_8756055129581449277_n.jpg

25299288_943248462505561_6255461567609433053_n.jpg

25299431_943248519172222_1598622632715212166_n.jpg

25348348_943248542505553_2333618243070638697_n.jpg

25508061_943248572505550_3020691202321223944_n.jpg

25398895_943248619172212_5068170909387052292_n.jpg

25398706_943248692505538_7333456497334040514_n.jpg


Latest pictures of underpass 01 near Chamkani on Reach 1 of BRT Corridor.


25348410_943546515809089_8648028362446374792_n.jpg

25443113_943546555809085_7134514133280381891_n.jpg

25395844_943546592475748_2809275954668520797_n.jpg

25446293_943546629142411_1628459825143901226_n.jpg

25354151_943546652475742_882373862208510306_n.jpg

25348633_943546699142404_3894123056007579209_n.jpg
 
. .
Latest pictures of underpass 01 near Chamkani on Reach 1 of BRT Corridor.


25348410_943546515809089_8648028362446374792_n.jpg





25354151_943546652475742_882373862208510306_n.jpg




Activities on Reach 2 at Sunehri Masjid road & Sir Syed Road. Reach 2 is all about elevated corridor.


25442988_943600502470357_1524705337661963447_n.jpg





25353880_943600565803684_3346780379753231226_n.jpg




25498154_943600635803677_5079756087836608451_n.jpg



25348708_943600749136999_6863514520766683265_n.jpg
 
.
Reach III: steel being piled for flyover at Hayatabad

25348285_342524969492177_2370711680141070313_n.jpg




Girder yard solely for Reach 2.


25446295_944017669095307_7795354911252596029_n.jpg



25395985_944017769095297_6521812829938326106_n.jpg
 
.
Girder yard solely for Reach 2.


25354075_944017635761977_680889903528675331_n.jpg

25446295_944017669095307_7795354911252596029_n.jpg

25443049_944017725761968_8875152276358213598_n.jpg

25395985_944017769095297_6521812829938326106_n.jpg

25498004_944017702428637_7042302235869271031_n.jpg


#PESHAWARBRT Update: Lean concrete on BRT track and RCC Cage for Retaining wall of underpass 05 Reach III on Phase 5 Road Hayatabad. Phase 5 end is the last destination of BRT Corridor.


25398885_944497075714033_2101826346100965978_n.jpg

25592120_944497119047362_4883797378907967796_n.jpg

25398960_944497162380691_5457160259894797214_n.jpg

25507842_944497199047354_891965431880991198_n.jpg

25507894_944497252380682_5424533215645282718_n.jpg

25398848_944497302380677_8109216620542347941_n.jpg
 
.
With feeder routes also included in the plan,i am sure KpK jangla bus will be much better than the one we have in punjab
 
.
It's night time but not for teams of BRT Corridor. All the teams are geared up for the completion of BRT Corridor.


25552074_944720682358339_6136546565465215921_n.jpg

25551916_944720759024998_5720108406692470391_n.jpg

25442994_944720805691660_4887180022671021174_n.jpg

25550205_944720829024991_2491579339300550842_n.jpg

25443194_944720862358321_7803852515784678597_n.jpg


Tonight's activities on Reach-II at Sir Syed road, Shoba bazar & Sunehri Masjid road.


25443260_944862862344121_4854910337175546163_n.jpg

25446262_944862895677451_7632543255143757186_n.jpg

25551914_944862912344116_494815574156054358_n.jpg

25399177_944862932344114_799999911219671157_n.jpg

25550175_944862952344112_8698934328535041814_n.jpg

25398783_944862979010776_7386131355711995978_n.jpg

25442856_944862995677441_5750856642772362426_n.jpg

25498266_944863022344105_6632127138213635341_n.jpg


Alternate route improvement along with underpass 04 at Peshawar University.


25550310_944863569010717_6753306374966002328_n.jpg

25552330_944863585677382_440488991984155312_n.jpg
25593907_944863602344047_5222635188571267773_n.jpg

25446205_944863632344044_381652908627351982_n.jpg
 
.

Pakistan Affairs Latest Posts

Back
Top Bottom