1. M-9 Motorway Karachi-Hyderabad is being built by FWO on a Build-Operate and Transfer basis (BOT) which means FWO will build this motorway on it's own funds,earn from it for 25 years and then transfer it to government.
Source:
http://www.fwo.com.pk/news-info/lat...on-karachi-hyderabad-motorway-m9-on-bot-basis
2. Lahore-Sialkot Motorway is being built by FWO on a Build-Operate and Transfer basis (BOT) which means FWO will build this motorway on it's own funds,earn from it for 25 years and then transfer it to government.
Source:
http://www.fwo.com.pk/news-info/lat...016-groundbreaking-of-lahore-sialkot-motorway
3. M-2 Islamabad-Lahore overlay and modernization was done by FWO on a Build-Operate and Transfer basis (BOT) which means FWO will earn from it for 25 years and then transfer it to government.
Source:
http://fwo.com.pk/mobile/new/index....-of-lahore-islamabad-motorway-m2-on-bot-basis
4. Hyderabad-Sukkur Motorway would also be built on a BOT Basis.
Source:
http://www.brecorder.com/top-storie...or-hyderabad-sukkur-motorway/?date=2016-10-16
5. 230 kms Lahore-Abdul Hakeem Section of Karachi-Lahore Motorway now renamed as Peshawar-Karachi Motorway (PKM) (Multan-Sukkur) has been awarded to M/s China Railway 20 Bureau Group Corporation while the 393 km Multan-Sukkur Section contract has also been awarded to M/s China State Construction Engineering Corporation Limited and $4.2 billion for them and Havelian-Thakot section of Hazara Motorway would be given by China's Exim Bank.
Now anybody would be fool to believe that they aren't doing this for any monetary benefits and going by the track records of Panama Brothers I am pretty sure that they would have awarded both these projects to chinese companies for a lifetime so that these Chinese companies would earn for a lifetime from all these Projects.
Source:
http://www.brecorder.com/taxation/181/40466/
6. Burhan-Havelian Sections of Hazara Motorway are being developed on a BOT basis too.
Source:
http://www.brecorder.com/taxation/181/40466/
7. To have insights into the BOT projects underway by NHA including highways,roads,tunnels and even bridges please follow these links for all respective provinces:
Punjab:
http://nha.gov.pk/en/document/bot-punjab/
Sindh:
http://nha.gov.pk/en/document/bot-sindh/
Balochistan:
http://nha.gov.pk/en/document/bot-balochistan/
KPK:
http://nha.gov.pk/en/document/bot-kpk/
Considering all these facts please count me the no. of projects with their magnitude too by Panama Brothers that are fully developed and funded by GOP ( Government of Pakistan).